APPENDIX X -
Contd.
Approximate
Cost
$
Desilting Shek Kong River 109,000 Repairs to collapsed slope at Tai Wan Ma On Shan Road 119,000 Reconstruction of Bus Terminus at +190 Platform Kwai Shing Estate (Kwai Chung Area 10E) 165,000 Resurfacing Works (Tarmacadam) P.T."., Fan Ling 310,000 Construction of Formation works for the Access Road to Tsing Yi Bridge 148,000 Approach Road to Tsing Yi Bridge, Access Road to Tsing Yi Town Construction of Road Works 142,000 Roads and Drainage Works in Sai Kung Reclamation, Stage I 901,000 Road Reinstatement charges at Tai Po Road and Sha Tsui Road 294,000 Access Road to the 'Nest' Fan Ling 162,000 Footpath along Luk Wu Ferry Road Opposite Fung Kai Public School, Sheung Shui 101,000218
Project
APPENDIX X -
Contd.
Approximate
Cost
$
Desilting Shek Kong River
109,000
Repairs to collapsed slope at Tai Wan
Ma On Shan Road
119,000
Reconstruction of Bus Terminus at +190 Platform
Kwai Shing Estate (Kwai Chung Area 10E
165,000
Resurfacing Works (Tarmacadam) P.T."., Fan Ling
310,000
Construction of Formation works for the Access Road
to Tsing Yi Bridge
148,000
Approach Road to Tsing Yi Bridge, Access Road to
Tsing Yi Town Construction of Road Works
142,000
Roads and Drainage Works in Sai Kung Reclamation,
Stage I
901,000
Road Reinstatement charges at Tai Po Road and Sha
sui Road
294,000
Access Road to the 'Nest' Fan Ling
V
162,000
Footpath along uk Wu Ferry Road Opposite Fung Kai
Public School, Sheung Shui
101,000