APPENDIX X -

Contd.

Approximate

Cost

$

Desilting Shek Kong River 109,000 Repairs to collapsed slope at Tai Wan Ma On Shan Road 119,000 Reconstruction of Bus Terminus at +190 Platform Kwai Shing Estate (Kwai Chung Area 10E) 165,000 Resurfacing Works (Tarmacadam) P.T."., Fan Ling 310,000 Construction of Formation works for the Access Road to Tsing Yi Bridge 148,000 Approach Road to Tsing Yi Bridge, Access Road to Tsing Yi Town Construction of Road Works 142,000 Roads and Drainage Works in Sai Kung Reclamation, Stage I 901,000 Road Reinstatement charges at Tai Po Road and Sha Tsui Road 294,000 Access Road to the 'Nest' Fan Ling 162,000 Footpath along Luk Wu Ferry Road Opposite Fung Kai Public School, Sheung Shui 101,000

218

Share This Page