33 taxiway lights at the South taxiway, 34 approach lights and 10 runway edge lights at the North-western end of the runway were also commissioned. Twelve high-tension panels complete with tripping battery systems were commissioned. As this Office's high voltage injection testing apparatus is normally retained at the Airport, this Section undertook the inspection and primary injection tests of 22 air current breakers ranging from 800 amps to 3000 amps for use in Housing Authority Estates.
Hong Kong City Hall
8.46 The Electrical and Mechanical Services Section maintains all the electrical, mechanical and air conditioning installations at the Hong Kong City Hall, carrying out the repair of faults, replacement of lamps of all types, installation of temporary wiring for flood and display lighting and the operation of the air conditioning plant totalling 735 tonnes of refrigeration. Operators were provided for stage lighting operations, cinema and slide projections. Routine maintenance continued throughout the year.
Lion Rock Tunnel
8.47 The Electrical and Mechanical Services Section operates and maintains all electrical and mechanical systems and electronic equipment connected with toll booths and recorders, carbon monoxide monitoring equipment, visibility indication and alarm equipment, height detection equipment, emergency communication equipment, fire extinguisher alarm equipment, traffic and signal control equipment, tunnel lighting, ventilation plant and "no-break generating sets as well as lane marker beacons at both ends of the toll plaza. Routine maintenance and general overhaul of plant and equipment continued throughout the year. The investigation by the Design and Projects Division into the up-grading of lighting within the tunnel, which was commenced last year, was held in abeyance due to lack of funds for the work.
Hospital Services
8.48 The Hospital Services Section is responsible for the operation and maintenance of mechanical and electrical equipment located in Government hospitals and clinics and also in the British Military Hospital. This plant includes steam boilers, calorifiers, autoclaves and sterilizers, steam heating, kitchen and laundry equipment, emergency generators, hydrotherapy pools, air conditioning plant and general lighting. In addition the Hung Hom Pumping Plant, for the supply of sea water to the Queen Elizabeth and British Military Hospitals' services, and the steam boiler and laundry equipment in the Medical Department Central Laundry at Shau Kei Wan are operated and maintained.
8.49 The nominal maintenance team established last year in the Princess Margaret Hospital for the purpose of commissioning plant and the implementation of maintenance schedules continued. The Hospital was due to be fully commissioned with effect from 1st April 1976 and the establishment of the full maintenance work force is progressing.
Page 105
Page 106
33 taxiway lights at the South taxiway, 34 approach lights and 10 runway edge lights at the North-western end of the runway were also commissioned. Twelve high-tension panels complete with tripping battery systems were commissioned. As this Office's high voltage injection testing apparatus is normally retained at the Airport, this Section undertook the inspection and primary injection tests of 22 air current breakers ranging from 800 amps to 3000 amps for use in Housing Authority Estates.
Hong Kong City Hall
8.46
The Electrical and Mechanical Services Section maintains all the electrical, mechanical and air conditioning installations at the Hong Kong City Hall, carrying out the repair of faults, replacement of lamps of all types, installation of temporary wiring for flood and display lighting and the operation of the air conditioning plant totalling 735 tonnes of refrigeration. Operators were provided for stage lighting operations, cinema and slide projections. Routine maintenance continued throughout the year.
Lion Rock Tunnel
8.47 The Electrical and Mechanical Services Section operates and maintains all electrical and mechanical systems and electronic equipment connected with toll booths and recorders, carbon monoxide monitoring equipment, visibility indication and alarm equipment, height detection equipment, emergency communication equipment, fire extinguisher alarm equipment, traffic and signal control equipment, tunnel lighting, ventilation plant and "no-break generating sets as well as lane marker beacons at both ends of the toll plaza. Routine maintenance and general overhaul of plant and equipment continued throughout the year. The investigation by the Design and Projects Division into the up-grading of lighting within the tunnel, which was commenced last year, was held in abeyance due to lack of funds for the work.
Hospital Services
8.48
The Hospital Services Section is responsible for the operation and maintenance of mechanical and electrical equipment located in Government hospitals and clinics and also in the British Military Hospital.
This plant includes steam boilers, calorifiers, autoclaves and sterilizers, steam heating, kitchen and laundry equipment, emergency generators, hydrotherapy pools, air conditioning plant and general lighting. In addition the Hung Hom Pumping Plant, for the supply of sea water to the Queen Elizabeth and British Military Hospitals' services, and the steam boiler and laundry equipment in the Medical Department Central Laundry at Shau Kei Wan are operated and maintained.
8.49
The nominal maintenance team established last year in the Princess Margaret Hospital for the purpose of commissioning plant and the implementation of maintenance schedules continued. The Hospital was due to be fully commissioned with effect from 1st April 1976 and the establishment of the full maintenance work force is progressing.