8.41
The Lai Chi Kok Compost Plant operated during the year according to the demand for compost. In eight months, 286 tons of compost was manufactured.
8.42
Throughout the year the Kennedy Town Abattoir operated for 24-hours daily to facilitate modifications and extension work. In the first half of the year this required re-structuring of staff to cover the longer operating hours. The switch of routine maintenance staff to operating functions caused a large backlog of maintenance work. Towards the middle of the year additional temporary posts were approved and when these were filled it was possible to maintain a reasonable level of maintenance.
8.43
The Cheung Sha Wan Abattoir operated satisfactorily throughout the year.
During the last Quarter the additional pig slaughtering equipment and Plant 'D' refrigeration plant were taken over for operation and maintenance.
Air Conditioning and Refrigeration Plant Sections
8.44 These Sections maintain all air conditioning and refrigeration plants including associated water pumps and chlorination equipment. At the end of the year 200 attended and automatic air conditioning and refrigeration plants totalling 10,574.7 tonnes of refrigeration were in operation. A further 163 air conditioning plants totalling 8,943.04 tonnes of refrigeration, 61 refrigeration plants totalling 339.1 tonnes of refrigeration, 321 chilled water, sea-water pumps and 21 sets of chlorination equipment were jointly maintained by these and other Sections of the Office. In addition 12 air conditioning and refrigeration plants totalling 220.2 tonnes of refrigeration installed on outlying islands were maintained on behalf of these Sections by the Electrical (Refrigerator and Room Cooler) Section, Hong Kong.
Hong Kong International Airport Electrical and Mechanical Services Section
8.45
This Section maintains all the electrical, mechanical and air conditioning systems as well as the runway and landing approach lights, substation equipment, air navigation beacons, baggage conveyor systems and passenger aerobridges for the International Airport. All plant and equipment was maintained throughout the year without major breakdown. In addition to routine maintenance and overhaul of plant and equipment, this Section carried out work connected with the Airport development on behalf of the Design and Projects Division. Three strobe beacons were repositioned, reconnected and commissioned in connection with the re-alignment of aircraft approach directions and four sets of neon obstruction lights were installed on the roof of the Airport Control Tower and commissioned. Some 3,000 metres of underground cable were laid in connection with the replacement of the South-eastern anemometer power cable on the demolition of the anemometer building. Standby generators with associated air circuit breakers, fuel tanks, pumps and automatic control systems were commissioned at 3 sub-stations and at the Glide Path/Distance-measuring Equipment building. An M.V. switchboard complete with 300 amp air circuit breaker at the apron services complex,
92
Page 104
8.41
The Lai Chi Kok Compost Plant operated during the year according to the demand for compost. In eight months, 286 tons of compost was manufactured.
8.42
Throughout the year the Kennedy Town Abattoir operated for 24-hours daily to facilitate modifications and extension work. In the first half of the year this required re-structuring of staff to cover the longer operating hours. The switch of routine maintenance staff to operating functions caused a large backlog of maintenance work. Towards the middle of the year additional temporary posts were approver and when these were filled it was possible to maintain a reasonable level of maintenance.
8.43
the year.
The Cheung Sha Wan Abattoir operated satisfactorily throughout
During the last Quarter the additional pig slaughtering equipment and Plant 'D' refrigeration plant were taken over for operation and maintenance.
Air Conditioning and Refrigeration Plant Sections
8.44 These Sections maintain all air conditioning and refrigeration plants including associated water pumps and chlorination equipment. At the end of the year 200 attended and automatic air conditioning and refrigeration plants totalling 10,574.7 tonnes of refrigeration were in operation. A further 163 air conditioning plants totalling 8,94304 tonnes of refrigeration, 61 refrigeration plants totalling 339.1 tonnes of refrigeration, 321 chilled water, sea-water pumps and 21 sets of chlorination equipment were jointly maintained by these and other Sections of the Office. In addition 12 air conditioning and refrigeration plants totalling 220.2 tonnes of refrigeration installed on outlying islands were maintained on behalf of these Sections by the Electrical (Refrigerator and Room Cooler) Section, Hong Kong.
Hong Kong International Airport Electrical and Mechanical Services Section
8.45
This Section maintains all the electrical, mechanical and air conditioning systems as well as the runway and landing approach lights, substation equipment, air navigation beacons, baggage conveyor systems and passenger aerobridges for the International Airport. All plant and equipment was maintained throughout the year without major breakdown. In addition to routine maintenance and overhaul of plant and equipment, this Section carried out work connected with the Airport development on behalf of the Design and Projects Division. Three strobe beacons were repositioned, reconnected and commissioned in connection with the re-alignment of aircraft approach directions and four sets of neon obstruction lights were installed on the roof of the Airport Control Tower and commissioned. Some 3,000 metres of underground cable were laid in connection with the replacement of the South-eastern anemometer power cable on the demolition of the anemometer building. Standby generators with associated air circuit breakers, fuel tanks, pumps and automatic control systems were commissioned at 3 sub-stations and at the Glide Path/Distance-measuring Equipment building. An M.V. switchboard complete with 300 amp air circuit breaker at the apron services complex,
92