Tuen Mun New Town

6.21

Construction of approximately 1.7 km. of dual carriageway main road through the northern half of Tuen Mun New Town was completed.

6.22

A contract for a 1.5 km. long extension of Pillar Point Road from Pak Kok Tsui to Pillar Point commenced and was nearing completion.

Refuse Disposal

6.23

Contracts for controlled tipping of refuse at Gin Drinkers Bay and Shuen Wan were progressing well whilst controlled tipping at Ngau Tam Mei was completed. A total of 924,600 tonnes of refuse was treated by controlled tipping technique. A site preparation contract for controlled tipping of refuse at Ngau Chi Wan commenced.

Airport Development

6.24

Six new aircraft parking bays constructed under Stage II of the Apron and Taxiway Extension Project were completed and are in use. A short length of the taxiway was still outstanding pending the completion of the adjacent section of the Airport Tunnel Road.

6.25

Good progress was maintained on major drainage contracts. The Kai Tak Nullah extension and two other arterial culverts in close vicinity were completed during the year. Plans for a further 270 metre extension of the Kai Tak Nullah were in hand.

6.26

Surfacing works were completed in conjunction with the development of the Apron Services Complex.

6.27

Construction for the new air cargo apron and associated facilities had commenced and good progress was maintained.

6.28

Contract works for a new taxiway and four parking bays for the R.A.F. were in progress and ahead of schedule.

6.29

Maintenance and minor new works to a total value of $889,000 were carried out during the year. An increased programme of runway painting, apron slab repairs and joint renewal was executed, substandard triple pit covers in the main apron were replaced and work commenced on repairs to the outer taxiway bridge.

6.30

Miscellaneous works for other departments or offices valued at $940,000 were completed. These included civil engineering works in connection with a Terminal Building Modification for the Architectural Office, modifications to substations, pits and ducts for H.T. ring main improvements for the Electrical & Mechanical Office, and installation of VASI approach guidance system at runway 13 and minor security works items for the Civil Aviation Department.

55

Edit History

2026-05-12 06:14:39 · NVIDIA / meta/llama-4-maverick-17b-128e-instruct
Live
View comparison
AI Proofread
Tuen Mun New Town 6.21 Construction of approximately 1.7 km. of dual carriageway main road through the northern half of Tuen Mun New Town was completed. 6.22 A contract for a 1.5 km. long extension of Pillar Point Road from Pak Kok Tsui to Pillar Point commenced and was nearing completion. Refuse Disposal 6.23 Contracts for controlled tipping of refuse at Gin Drinkers Bay and Shuen Wan were progressing well whilst controlled tipping at Ngau Tam Mei was completed. A total of 924,600 tonnes of refuse was treated by controlled tipping technique. A site preparation contract for controlled tipping of refuse at Ngau Chi Wan commenced. Airport Development 6.24 Six new aircraft parking bays constructed under Stage II of the Apron and Taxiway Extension Project were completed and are in use. A short length of the taxiway was still outstanding pending the completion of the adjacent section of the Airport Tunnel Road. 6.25 Good progress was maintained on major drainage contracts. The Kai Tak Nullah extension and two other arterial culverts in close vicinity were completed during the year. Plans for a further 270 metre extension of the Kai Tak Nullah were in hand. 6.26 Surfacing works were completed in conjunction with the development of the Apron Services Complex. 6.27 Construction for the new air cargo apron and associated facilities had commenced and good progress was maintained. 6.28 Contract works for a new taxiway and four parking bays for the R.A.F. were in progress and ahead of schedule. 6.29 Maintenance and minor new works to a total value of $889,000 were carried out during the year. An increased programme of runway painting, apron slab repairs and joint renewal was executed, substandard triple pit covers in the main apron were replaced and work commenced on repairs to the outer taxiway bridge. 6.30 Miscellaneous works for other departments or offices valued at $940,000 were completed. These included civil engineering works in connection with a Terminal Building Modification for the Architectural Office, modifications to substations, pits and ducts for H.T. ring main improvements for the Electrical & Mechanical Office, and installation of VASI approach guidance system at runway 13 and minor security works items for the Civil Aviation Department. 55
Baseline (Original)
Tuen Mun New Town 6.21 Construction of approximately 1.7 km. of dual carriageway main road through the northern half of Tuen Mun New Town was completed. 6.22 A contract for a 1.5 km. long extension of Pillar Point Road from Pak Kok Tsui to Pillar Point commenced and was nearing completion. Refuse Disposal 6.23 Contracts for controlled tipping of refuse at Gin Drinkers Bay and Shuen Wan were progressing well whilst controlled tipping at Ngau Tam Mei was completed. A total of 924,600 tonnes of refuse was treated by controlled tipping technique. A site preparation contract for controlled tipping of refuse at Ngau Chi Wan commenced. Airport Development 6.24 Six new aircraft parking bays constructed under Stage II of the Apron and Taxiway Extension Project were completed and are in use. A short length of the taxiway was still outstanding pending the completion of the adjacent section of the Airport Tunnel Road. 6.25 Good progress was maintained on major drainage contracts. The Kai Tak Nullah extension and two other arterial culverts in close vicinity were completed during the year. Plans for a further 270 metre extension of the Kai Tak Nullah were in hand. 6.26 Surfacing works were completed in conjunction with the development of the Apron Services Complex. 6.27 Construction for the new air cargo apron and associated facilities had commenced and good progress was maintained. 6.28 Contract works for a new taxiway and four parking bays for the R.A.F. were in progress and ahead of schedule. 6.29 Maintenance and minor new works to a total value of $889,000 were carried out during the year. An increased programme of runway painting, apron slab repairs and joint renewal was executed, substandard triple pit covers in the main apron were replaced and work commenced on repairs to the outer taxiway bridge. 6.30 Miscellaneous works for other departments or offices valued at $940,000 were completed. These included civil engineering works in connection with a Terminal Building Modification for the Architectural Office, modificat- ions to substations, pits and ducts for H.T. ring main improvements for the Electrical & Mechanical Office, and installation of VASI approach guidance system at runway 13 and minor security works items for the Civil Aviation Department. 55
2026-05-12 06:14:39 · Baseline
View content

Tuen Mun New Town

6.21

Construction of approximately 1.7 km. of dual carriageway main road through the northern half of Tuen Mun New Town was completed.

6.22

A contract for a 1.5 km. long extension of Pillar Point Road from Pak Kok Tsui to Pillar Point commenced and was nearing completion.

Refuse Disposal

6.23

Contracts for controlled tipping of refuse at Gin Drinkers Bay and Shuen Wan were progressing well whilst controlled tipping at Ngau Tam Mei was completed. A total of 924,600 tonnes of refuse was treated by controlled tipping technique. A site preparation contract for controlled tipping of refuse at Ngau Chi Wan commenced.

Airport Development

6.24

Six new aircraft parking bays constructed under Stage II of the Apron and Taxiway Extension Project were completed and are in use. A short length of the taxiway was still outstanding pending the completion of the adjacent section of the Airport Tunnel Road.

6.25

Good progress was maintained on major drainage contracts. The Kai Tak Nullah extension and two other arterial culverts in close vicinity were completed during the year. Plans for a further 270 metre extension of the Kai Tak Nullah were in hand.

6.26

Surfacing works were completed in conjunction with the development of the Apron Services Complex.

6.27

Construction for the new air cargo apron and associated facilities had commenced and good progress was maintained.

6.28

Contract works for a new taxiway and four parking bays for the R.A.F. were in progress and ahead of schedule.

6.29

Maintenance and minor new works to a total value of $889,000 were carried out during the year. An increased programme of runway painting, apron slab repairs and joint renewal was executed, substandard triple pit covers in the main apron were replaced and work commenced on repairs to the outer taxiway bridge.

6.30

Miscellaneous works for other departments or offices valued at $940,000 were completed. These included civil engineering works in connection with a Terminal Building Modification for the Architectural Office, modificat- ions to substations, pits and ducts for H.T. ring main improvements for the Electrical & Mechanical Office, and installation of VASI approach guidance system at runway 13 and minor security works items for the Civil Aviation Department.