nection with M.T.R. Works Stage I which had been completed. In addition, similar plans for Stage II, which were in an advanced stage, will require modification.

Pedestrian Facilities

9.82 There was a net increase of 11 zebra crossings on the Island and 14 on the Mainland.

9.83 A scheme for phasing out existing stud crossings and replacing them with signal controlled crossings or zebra crossings, where warranted, continued.

9.84 A temporary wooden footbridge was provided in Harcourt Road, near the Furama Hotel, on the Island.

9.85 Modifications were carried out to the time settings of a large number of existing traffic light signal installations to facilitate pedestrian movements at road intersections.

9.86 Work continued on the installation of flashing units for all signal controlled pedestrian crossings, 54 sets being completed during the year.

Investigation

9.87 109 traffic counts and 17 minor traffic studies were carried out in conjunction with traffic management schemes on the Island. On the Mainland, 95 traffic counts were conducted.

9.88 A study report was prepared on possible traffic management measures to alleviate anticipated problems arising from building redevelopment in the Pokfulam area on the Island.

9.89 A comprehensive study was carried out on the effects of wide-bodied tram cars on road capacity.

9.90 A report on the performance of the mini-roundabout introduced at Piper's Hill Interchange as part of the traffic diversion works was completed and circulated.

Planning and Design

9.91 Examination of Town Planning Layouts prepared by the Town Planning Office continued throughout the year. Recommendations and comments covering traffic engineering aspects were made in each case.

9.92 On the Island, a total of 53 traffic engineering schemes were prepared, including 5 segments of the long term road proposals and 3 grade-separated intersections.

9.93 On the Mainland, proposals for a large number of major traffic engineering schemes were planned. Among the more important ones were the Sham Shui Po Ferry Concourse Complex, Improvement to Tuen Mun Roundabout, Route Alignment of Sha Tin - Tai Po Coastal Road and Island House Interchange, widening of Tai Po Road north of Lam Kam Road junction and Wai Yip Street Extension.

106

Page 120

Page 121

Edit History

2026-05-12 06:28:58 · NVIDIA / meta/llama-4-maverick-17b-128e-instruct
Live
View comparison
AI Proofread
nection with M.T.R. Works Stage I which had been completed. In addition, similar plans for Stage II, which were in an advanced stage, will require modification. Pedestrian Facilities 9.82 There was a net increase of 11 zebra crossings on the Island and 14 on the Mainland. 9.83 A scheme for phasing out existing stud crossings and replacing them with signal controlled crossings or zebra crossings, where warranted, continued. 9.84 A temporary wooden footbridge was provided in Harcourt Road, near the Furama Hotel, on the Island. 9.85 Modifications were carried out to the time settings of a large number of existing traffic light signal installations to facilitate pedestrian movements at road intersections. 9.86 Work continued on the installation of flashing units for all signal controlled pedestrian crossings, 54 sets being completed during the year. Investigation 9.87 109 traffic counts and 17 minor traffic studies were carried out in conjunction with traffic management schemes on the Island. On the Mainland, 95 traffic counts were conducted. 9.88 A study report was prepared on possible traffic management measures to alleviate anticipated problems arising from building redevelopment in the Pokfulam area on the Island. 9.89 A comprehensive study was carried out on the effects of wide-bodied tram cars on road capacity. 9.90 A report on the performance of the mini-roundabout introduced at Piper's Hill Interchange as part of the traffic diversion works was completed and circulated. Planning and Design 9.91 Examination of Town Planning Layouts prepared by the Town Planning Office continued throughout the year. Recommendations and comments covering traffic engineering aspects were made in each case. 9.92 On the Island, a total of 53 traffic engineering schemes were prepared, including 5 segments of the long term road proposals and 3 grade-separated intersections. 9.93 On the Mainland, proposals for a large number of major traffic engineering schemes were planned. Among the more important ones were the Sham Shui Po Ferry Concourse Complex, Improvement to Tuen Mun Roundabout, Route Alignment of Sha Tin - Tai Po Coastal Road and Island House Interchange, widening of Tai Po Road north of Lam Kam Road junction and Wai Yip Street Extension. 106 Page 120 Page 121
Baseline (Original)
nection with M.T.R. Works Stage I which had been completed. In addition, similar plans for Stage II, which were in an advanced stage, will require modification. Pedestrian Facilities 9.82 There was a net increase of 11 zebra crossings on the Island and 14 on the Mainland. 9.83 A scheme for phasing out existing stud crossings and replacing them with signal controlled crossings or zebra crossings, where warranted, continued 9.84 A temporary wooden footbridge was provided in Harcourt Road, near the Furama Hotel, on the Island. 9.85 Modifications were carried out to the time settings of a large number of existing traffic light signal installations to facilitate pedestrian move- ments at road intersections. 9.86 Work continued on the installation of flashing units for all signal controlled pedestrian crossings, 54 sets being completed during the year. Investigation 9.87 109 traffic counts and 17 minor traffic studies were carried out in conjunction with traffic management schemes on the Island. On the Mainland, 95 traffic counts were conducted. 9.88 A study report was prepared on possible traffic management measures to alleviate anticipated problems arising from building redevelopment in the Pokfulam area on the Island. 9.89 A comprehensive study was carried out on the effects of wide-bodied tram cars on road capacity. 9.90 A report on the performance of the mini-roundabout introduced at Piper's Hill Interchange as part of the traffic diversion works was completed and circulated. Planning and Design 9.91 Examination of Town Planning Layouts prepared by the Town Planning Office continued throughout the year. Recommendations and comments covering traffic engineering aspects were made in each case. 9.92 On the Island, a total of 53 traffic engineering schemes were prepared, including 5 segments of the long term road proposals and 3 grade- separated intersections. 9.93 On the Mainland, proposals for a large number of major traffic engineering schemes were planned. Among the more important ones were the Sham Shui Po Ferry Concourse Complex, Improvement to Tuen Mun Roundabout, Route Alignment of Sha Tin - Tai Po Coastal Road and Island House Interchange, widening of Tai Po Road north of Lam Kam Road junction and Wai Yip Street Extension. 106 Page 120Page 121
2026-05-12 06:28:58 · Baseline
View content

nection with M.T.R. Works Stage I which had been completed. In addition, similar plans for Stage II, which were in an advanced stage, will require modification.

Pedestrian Facilities

9.82

There was a net increase of 11 zebra crossings on the Island and 14 on the Mainland.

9.83

A scheme for phasing out existing stud crossings and replacing them with signal controlled crossings or zebra crossings, where warranted, continued

9.84

A temporary wooden footbridge was provided in Harcourt Road, near the Furama Hotel, on the Island.

9.85

Modifications were carried out to the time settings of a large number of existing traffic light signal installations to facilitate pedestrian move- ments at road intersections.

9.86

Work continued on the installation of flashing units for all signal controlled pedestrian crossings, 54 sets being completed during the year.

Investigation

9.87

109 traffic counts and 17 minor traffic studies were carried out in conjunction with traffic management schemes on the Island. On the Mainland, 95 traffic counts were conducted.

9.88

A study report was prepared on possible traffic management measures to alleviate anticipated problems arising from building redevelopment in the Pokfulam area on the Island.

9.89

A comprehensive study was carried out on the effects of wide-bodied tram cars on road capacity.

9.90

A report on the performance of the mini-roundabout introduced at Piper's Hill Interchange as part of the traffic diversion works was completed and circulated.

Planning and Design

9.91 Examination of Town Planning Layouts prepared by the Town Planning Office continued throughout the year. Recommendations and comments covering traffic engineering aspects were made in each case.

9.92 On the Island, a total of 53 traffic engineering schemes were prepared, including 5 segments of the long term road proposals and 3 grade- separated intersections.

9.93 On the Mainland, proposals for a large number of major traffic engineering schemes were planned. Among the more important ones were the Sham Shui Po Ferry Concourse Complex, Improvement to Tuen Mun Roundabout, Route Alignment of Sha Tin - Tai Po Coastal Road and Island House Interchange, widening of Tai Po Road north of Lam Kam Road junction and Wai Yip Street Extension.

106