service reservoir in the same area is also being formed. The soil and rock excavated at these two sites are being used to augment the filling material for the reclamations at Wan Chai and Causeway Bay.

Aberdeen

5.33. Work has almost been completed on the construction of the two break-water arms situated in Aberdeen Channel.

Aldrich Bay

5.34. A contract was let and work commenced on the construction of a rubble mound breakwater extending into Aldrich Bay to provide a typhoon shelter at the fishing port of Shau Kei Wan.

Kowloon Bay Reclamation

5.35. Construction of another 1,000 ft. of seawall, as an extension of the existing seawall at Kowloon Bay, is now proceeding at a satisfactory rate. More than 50% of the work has been completed.

Cheung Sha Wan Reclamation

5.36. The last section of the seawall required to retain the Cheung Sha Wan reclamation was substantially complete.

Abbatoir Pier at Cheung Sha Wan

5.37. Construction of this cattle pier for the Cheung Sha Wan abbatoir was completed.

Yau Ma Tei Slipway Reprovisioning

5.38. The construction of the three slipways and the pier to replace the existing facilities in the Yau Ma Tei typhoon shelter was substantially complete. The installation of machinery and equipment is in hand.

Yau Ma Tei Saltwater Pumphouse

5.39. Work started on the construction of the saltwater pumphouse on the outside of the breakwater arm which forms the ex-naval camber. This pumphouse when completed, will supply water for flushing and air-conditioning to buildings in the area.

Tai Wan Reclamation

5.40. Construction of approximately 1,000 ft. of seawall at Tai Wan is now proceeding. The reclamation will be used for public open space and for a pumping station.

47

Edit History

2026-05-12 00:35:29 · NVIDIA / meta/llama-4-maverick-17b-128e-instruct
Live
View comparison
AI Proofread
service reservoir in the same area is also being formed. The soil and rock excavated at these two sites are being used to augment the filling material for the reclamations at Wan Chai and Causeway Bay. Aberdeen 5.33. Work has almost been completed on the construction of the two break-water arms situated in Aberdeen Channel. Aldrich Bay 5.34. A contract was let and work commenced on the construction of a rubble mound breakwater extending into Aldrich Bay to provide a typhoon shelter at the fishing port of Shau Kei Wan. Kowloon Bay Reclamation 5.35. Construction of another 1,000 ft. of seawall, as an extension of the existing seawall at Kowloon Bay, is now proceeding at a satisfactory rate. More than 50% of the work has been completed. Cheung Sha Wan Reclamation 5.36. The last section of the seawall required to retain the Cheung Sha Wan reclamation was substantially complete. Abbatoir Pier at Cheung Sha Wan 5.37. Construction of this cattle pier for the Cheung Sha Wan abbatoir was completed. Yau Ma Tei Slipway Reprovisioning 5.38. The construction of the three slipways and the pier to replace the existing facilities in the Yau Ma Tei typhoon shelter was substantially complete. The installation of machinery and equipment is in hand. Yau Ma Tei Saltwater Pumphouse 5.39. Work started on the construction of the saltwater pumphouse on the outside of the breakwater arm which forms the ex-naval camber. This pumphouse when completed, will supply water for flushing and air-conditioning to buildings in the area. Tai Wan Reclamation 5.40. Construction of approximately 1,000 ft. of seawall at Tai Wan is now proceeding. The reclamation will be used for public open space and for a pumping station. 47
Baseline (Original)
service reservoir in the same area is also being formed. The soil and rock excavated at these two sites are being used to augment the filling material for the reclamations at Wan Chai and Causeway Bay. Aberdeen 5.33. Work has almost been completed on the construction of the two break-water arms situated in Aberdeen Channel. Aldrich Bay 5.34. A contract was let and work commenced on the construction of a rubble mound breakwater extending into Aldrich Bay to provide a typhoon shelter at the fishing port of Shau Kei Wan. Kowloon Bay Reclamation 5.35. Construction of another 1,000 ft. of seawall, as an extension of the existing seawall at Kowloon Bay, is now proceeding at a satisfactory rate. More than 50% of the work has been completed. Cheung Sha Wan Reclamation 5.36. The last section of the seawall required to retain the Cheung Sha Wan reclamation was substantially complete. Abbatoir Pier at Cheung Sha Wan 5.37. Construction of this cattle pier for the Cheung Sha Wan abbatoir was completed. Yau Ma Tei Slipway Reprovisioning 5.38. The construction of the three slipways and the pier to replace the existing facilities in the Yau Ma Tei typhoon shelter was substantially complete. The installation of machinery and equipment is in hand. Yau Ma Tei Saltwater Pumphouse 5.39. Work started on the construction of the saltwater pumphouse on the outside of the breakwater arm which forms the ex-naval camber. This pumphouse when completed, will supply water for flushing and air-conditioning to buildings in the area. Tai Wan Reclamation ***** 5.40. Construction of approximately 1,000 ft. of seawall at Tai Wan is now proceeding. The reclamation will be used for public open space and for a pumping station. 47
2026-05-12 00:35:29 · Baseline
View content

service reservoir in the same area is also being formed. The soil and rock excavated at these two sites are being used to augment the filling material for the reclamations at Wan Chai and Causeway Bay.

Aberdeen

5.33. Work has almost been completed on the construction of the two break-water arms situated in Aberdeen Channel.

Aldrich Bay

5.34. A contract was let and work commenced on the construction of a rubble mound breakwater extending into Aldrich Bay to provide a typhoon shelter at the fishing port of Shau Kei Wan.

Kowloon Bay Reclamation

5.35. Construction of another 1,000 ft. of seawall, as an extension of the existing seawall at Kowloon Bay, is now proceeding at a satisfactory rate. More than 50% of the work has been completed.

Cheung Sha Wan Reclamation

5.36. The last section of the seawall required to retain the Cheung Sha Wan reclamation was substantially complete.

Abbatoir Pier at Cheung Sha Wan

5.37. Construction of this cattle pier for the Cheung Sha Wan abbatoir was completed.

Yau Ma Tei Slipway Reprovisioning

5.38. The construction of the three slipways and the pier to replace the existing facilities in the Yau Ma Tei typhoon shelter was substantially complete. The installation of machinery and equipment is in hand.

Yau Ma Tei Saltwater Pumphouse

5.39. Work started on the construction of the saltwater pumphouse on the outside of the breakwater arm which forms the ex-naval camber. This pumphouse when completed, will supply water for flushing and air-conditioning to buildings in the area.

Tai Wan Reclamation

***** 5.40. Construction of approximately 1,000 ft. of seawall at Tai Wan is now proceeding. The reclamation will be used for public open space and for a pumping station.