# APPENDIX O

# CIVIL ENGINEERING OFFICE

## GENERAL STATISTICS

Hong Kong Kowloon New Territories Total (A) Length of Road Works Carried Out (Miles) New Roads Completed 1.40 3.30 9.00 13.70 Existing Roads Reconstructed ... 3.80 1.50 ... Existing Roads Resurfaced 2.30 7.60 ... ... 40.20 56.40 (B) Drainage Works Carried Out New Drains Laid (Feet) 27,412 48,559 99,930 175,901 Defective Drains Replaced (Feet) 37,384 3,417 301 41,102 Connections Provided (Nos.) ... 1,195 1,421 ... Chokes Clearance (Nos.) 490 3,106 ... ... Sand cleared from Culverts (cu. yd.) 9,899 8,342 777 19,018 ... 31,428 100,479 ... 84,784 216,691 (C) Road Opening Permits Issued to: Utilities and Service Departments 2,452 3,092 358 5,902 Government Departments ... 1,442 829 ... 119 2,390 (D) Work carried out in New Resettlement and Low Cost Housing Estates Length of roads constructed (Miles) 0.90 1.90 ... ... 1.10 ... 4.60 ... 3.70 2.40 8.00 Length of drains laid (Miles) 2.60 (E) Production in Government Quarries Total Crushed Stone (Ton) 1962-63 98,074 103,297 201,371 1963-64 95,698 87,357 183,055 1964-65 67,979 78,858 146,837 1965-66 84,650 69,886 154,536 1966-67 86,291 50,969 137,260 Bitumen Coated Materials (Ton) ... (F) Materials Testing Laboratory 1962-63 70,186 36,130 106,316 1963-64 85,277 33,674 118,951 1964-65 65,708 29,633 95,341 1965-66 81,050 40,361 121,411 1966-67 86,845 29,947 116,792

Physical tests on soil and building materials carried out during the year totalled 45,050 and comprised the following:

Tests for compressive strength of concrete 26,472 Tests on physical properties of cement ... Aggregate grading and other tests... 184 Tests on steel and other metals 1,491 Tests on bitumen and bituminous products 9,647 Soil test ... Pipe test 938 Miscellaneous tests 4,182 ... 120 ... 2,016 120

Edit History

2026-05-12 00:21:16 · NVIDIA / meta/llama-4-maverick-17b-128e-instruct
Live
View comparison
AI Proofread
# APPENDIX O # CIVIL ENGINEERING OFFICE ## GENERAL STATISTICS Hong Kong Kowloon New Territories Total (A) Length of Road Works Carried Out (Miles) New Roads Completed 1.40 3.30 9.00 13.70 Existing Roads Reconstructed ... 3.80 1.50 ... Existing Roads Resurfaced 2.30 7.60 ... ... 40.20 56.40 (B) Drainage Works Carried Out New Drains Laid (Feet) 27,412 48,559 99,930 175,901 Defective Drains Replaced (Feet) 37,384 3,417 301 41,102 Connections Provided (Nos.) ... 1,195 1,421 ... Chokes Clearance (Nos.) 490 3,106 ... ... Sand cleared from Culverts (cu. yd.) 9,899 8,342 777 19,018 ... 31,428 100,479 ... 84,784 216,691 (C) Road Opening Permits Issued to: Utilities and Service Departments 2,452 3,092 358 5,902 Government Departments ... 1,442 829 ... 119 2,390 (D) Work carried out in New Resettlement and Low Cost Housing Estates Length of roads constructed (Miles) 0.90 1.90 ... ... 1.10 ... 4.60 ... 3.70 2.40 8.00 Length of drains laid (Miles) 2.60 (E) Production in Government Quarries Total Crushed Stone (Ton) 1962-63 98,074 103,297 201,371 1963-64 95,698 87,357 183,055 1964-65 67,979 78,858 146,837 1965-66 84,650 69,886 154,536 1966-67 86,291 50,969 137,260 Bitumen Coated Materials (Ton) ... (F) Materials Testing Laboratory 1962-63 70,186 36,130 106,316 1963-64 85,277 33,674 118,951 1964-65 65,708 29,633 95,341 1965-66 81,050 40,361 121,411 1966-67 86,845 29,947 116,792 Physical tests on soil and building materials carried out during the year totalled 45,050 and comprised the following: Tests for compressive strength of concrete 26,472 Tests on physical properties of cement ... Aggregate grading and other tests... 184 Tests on steel and other metals 1,491 Tests on bitumen and bituminous products 9,647 Soil test ... Pipe test 938 Miscellaneous tests 4,182 ... 120 ... 2,016 120
Baseline (Original)
APPENDIX O CIVIL ENGINEERING OFFICE GENERAL STATISTICS New Hong Kong Kowloon Total Territories (A) Length of Road Works Carried Out (Miles) New Roads Completed Existing Roads Reconstructed Existing Roads Resurfaced (B) Drainage Works Carried Out New Drains Laid (Feet) Defective Drains Replaced (Feet) Connections Provided (Nos.) Chokes Clearance (Nos.) Sand cleared from Culverts (cu. yd.) (C) Road Opening Permits Issued to: Utilities and Service Departments Government Departments (D) Work carried out in New Resettlement and Low Cost Housing Estates 1.40 3.30 9.00 13.70 ... 3.80 1.50 2.30 7.60 ... 8.60 7.60 40.20 56.40 27,412 48,559 99,930 175,901 37,384 3,417 301 41,102 ... 1,195 1,421 490 3,106 9,899 8,342 777 19,018 ... 31,428 100,479 84,784 216,691 ... 2,452 3,092 358 5,902 ... 1,442 829 119 2,390 Length of roads constructed (Miles) Length of drains laid (Miles) 0.90 1.90 2.60 1.10 4.60 3.70 2.40 8.00 ... ... (E) Production in Government Quarries Mainland Island ... Total Mainland Island Total ... Total Crushed Stone (Ton) 1962-63 1963-64 1964-65 1965-66 1966-67 98,074 95,698 67,979 84,650 86,291 103,297 · 87,357 78,858 69,886 50,969 201,371 183,055 146,837 154,536 137,260 Bitumen Coated Materials (Ton) ... (F) Materials Testing Laboratory 1962-63 1963-64 1964-65 1965-66 1966-67 70,186 85,277 65,708 81,050 86,845 36,130 33,674 29,633 40,361 29,947 106,316 118,951 95,341 121,411 116,792 Physical tests on soil and building materials carried out during the year totalled 45,050 and comprised the following: 26,472 ... ... 184 1,491 9,647 Tests for compressive strength of concrete Tests on physical properties of cement Aggregate grading and other tests... Tests on steel and other metals ... Tests on bitumen and bituminous products Soil test Pipe test ... Miscellaneous tests ... ... 938 4,182 120 2,016 120
2026-05-12 00:21:16 · Baseline
View content

APPENDIX O

CIVIL ENGINEERING OFFICE

GENERAL STATISTICS

New

Hong Kong Kowloon

Total

Territories

(A) Length of Road Works Carried Out (Miles)

New Roads Completed

Existing Roads Reconstructed Existing Roads Resurfaced

(B) Drainage Works Carried Out

New Drains Laid (Feet)

Defective Drains Replaced (Feet) Connections Provided (Nos.) Chokes Clearance (Nos.)

Sand cleared from Culverts (cu. yd.)

(C) Road Opening Permits Issued to:

Utilities and Service Departments Government Departments

(D) Work carried out in New Resettlement and Low Cost Housing Estates

1.40

3.30

9.00

13.70

...

3.80

1.50

2.30

7.60

...

8.60

7.60

40.20

56.40

27,412

48,559

99,930

175,901

37,384

3,417

301

41,102

...

1,195 1,421

490

3,106

9,899

8,342

777

19,018

...

31,428

100,479

84,784 216,691

...

2,452 3,092

358

5,902

...

1,442

829

119

2,390

Length of roads constructed (Miles) Length of drains laid (Miles)

0.90 1.90

2.60

1.10

4.60

3.70

2.40

8.00

...

...

(E) Production in Government Quarries

Mainland Island

...

Total

Mainland Island

Total

...

Total Crushed Stone (Ton)

1962-63 1963-64 1964-65 1965-66 1966-67

98,074 95,698 67,979 84,650 86,291 103,297 · 87,357 78,858 69,886 50,969

201,371 183,055 146,837 154,536 137,260

Bitumen Coated Materials (Ton)

...

(F) Materials Testing Laboratory

1962-63 1963-64 1964-65 1965-66 1966-67 70,186 85,277 65,708 81,050 86,845 36,130 33,674 29,633 40,361 29,947

106,316 118,951 95,341 121,411 116,792

Physical tests on soil and building materials carried out during the year totalled 45,050 and comprised the following:

26,472

...

...

184 1,491

9,647

Tests for compressive strength of concrete Tests on physical properties of cement Aggregate grading and other tests... Tests on steel and other metals

...

Tests on bitumen and bituminous products

Soil test

Pipe test

...

Miscellaneous tests

...

...

938 4,182

120 2,016

120