5.12. The construction of the causeway across Castle Peak Bay at San Hui and the associated 1,700-foot-long main drainage channel were substantially completed. Most of the piles for the reinforced concrete bridge spanning the channel were also driven.

MISCELLANEOUS

5.13. A manual of 'Technical Instruction' and a set of 'Regulations' for Surveying Assistants (Engineering) were completed in draft and circulated to other sub-departments for comments.

DRAINAGE OFFICE

Chief Engineer:

T. K. HUM, M.Eng.(McGill), A.M.I.C.E., M.E.I.C.(Canada)

GENERAL

6.01. To cope with the expanding needs of the Colony 59 miles of new stormwater drains and sewers were added to the drainage systems.

6.02. The year saw a start on an examination of the problem of overloading of the sewerage system in the heavily built up areas.

6.03. The following table shows the works carried out during the year:

Island Kowloon & New Kowloon New Territories Total New drains laid (length in feet) 61,623 181,167 69,047 311,837 Defective drains replaced (length in feet) 7,160 4,239 1,809 13,208 Connexions provided (Nos.) 1,048 2,833 234 4,115 Chokes cleared (Nos.) 7,296 6,378 181 13,855 Sand cleared from culverts and nullahs (cubic yards) ... 4,171 80,290 93,153 8,692

SEWERAGE AND SEWAGE DISPOSAL

6.04. The Sewer Duplication Section was formed during the year with the task of investigating the existing sewerage systems and designing the improvements necessary to transport and treat the increased

Edit History

2026-05-11 22:45:11 · NVIDIA / meta/llama-4-maverick-17b-128e-instruct
Live
View comparison
AI Proofread
Castle Peak 5.12. The construction of the causeway across Castle Peak Bay at San Hui and the associated 1,700-foot-long main drainage channel were substantially completed. Most of the piles for the reinforced concrete bridge spanning the channel were also driven. MISCELLANEOUS 5.13. A manual of 'Technical Instruction' and a set of 'Regulations' for Surveying Assistants (Engineering) were completed in draft and circulated to other sub-departments for comments. DRAINAGE OFFICE Chief Engineer: T. K. HUM, M.Eng.(McGill), A.M.I.C.E., M.E.I.C.(Canada) GENERAL 6.01. To cope with the expanding needs of the Colony 59 miles of new stormwater drains and sewers were added to the drainage systems. 6.02. The year saw a start on an examination of the problem of overloading of the sewerage system in the heavily built up areas. 6.03. The following table shows the works carried out during the year: Island Kowloon & New Kowloon New Territories Total New drains laid (length in feet) 61,623 181,167 69,047 311,837 Defective drains replaced (length in feet) 7,160 4,239 1,809 13,208 Connexions provided (Nos.) 1,048 2,833 234 4,115 Chokes cleared (Nos.) 7,296 6,378 181 13,855 Sand cleared from culverts and nullahs (cubic yards) ... 4,171 80,290 93,153 8,692 SEWERAGE AND SEWAGE DISPOSAL 6.04. The Sewer Duplication Section was formed during the year with the task of investigating the existing sewerage systems and designing the improvements necessary to transport and treat the increased
Baseline (Original)
Castle Peak 5.12. The construction of the causeway across Castle Peak Bay at San Hui and the associated 1,700-foot-long main drainage channel were substantially completed. Most of the piles for the reinforced concrete bridge spanning the channel were also driven. MISCELLANEOUS 5.13. A manual of 'Technical Instruction' and a set of 'Regulations' for Surveying Assistants (Engineering) were completed in draft and cir- culated to other sub-departments for comments. DRAINAGE OFFICE Chief Engineer: T. K. HUM, M.Eng. (McGill), A.M.I.C.E., M.E.I.C. (Canada) GENERAL 6.01. To cope with the expanding needs of the Colony 59 miles of new stormwater drains and sewers were added to the drainage systems. 6.02. The year saw a start on an examination of the problem of overloading of the sewerage system in the heavily built up areas. 6.03. The following table shows the works carried out during the year: Island New drains laid (length in feet).. 61,623 181,167 Kowloon & New New Kowloon Territories 69,047 Total 311,837 Defective drains replaced (length in feet) 7,160 4,239 1,809 13,208 Connexions provided (Nos.) 1,048 2,833 234 4,115 Chokes cleared (Nos.) 7,296 6,378 181 13,855 Sand cleared from culverts and nullahs (cubic yards) ... 4,171 80,290 8,692 93,153 SEWERAGE AND SEWAGE DISPOSAL 6.04. The Sewer Duplication Section was formed during the year with the task of investigating the existing sewerage systems and design- ing the improvements necessary to transport and treat the increased 39
2026-05-11 22:45:11 · Baseline
View content

Castle Peak

5.12. The construction of the causeway across Castle Peak Bay at San Hui and the associated 1,700-foot-long main drainage channel were substantially completed. Most of the piles for the reinforced concrete bridge spanning the channel were also driven.

MISCELLANEOUS

5.13. A manual of 'Technical Instruction' and a set of 'Regulations' for Surveying Assistants (Engineering) were completed in draft and cir- culated to other sub-departments for comments.

DRAINAGE OFFICE

Chief Engineer:

T. K. HUM, M.Eng. (McGill), A.M.I.C.E., M.E.I.C. (Canada)

GENERAL

6.01. To cope with the expanding needs of the Colony 59 miles of new stormwater drains and sewers were added to the drainage systems. 6.02. The year saw a start on an examination of the problem of overloading of the sewerage system in the heavily built up areas.

6.03. The following table shows the works carried out during the

year:

Island

New drains laid (length in feet)..

61,623

181,167

Kowloon & New New Kowloon Territories

69,047

Total

311,837

Defective drains replaced (length

in feet)

7,160

4,239

1,809

13,208

Connexions provided (Nos.)

1,048

2,833

234

4,115

Chokes cleared (Nos.)

7,296

6,378

181

13,855

Sand cleared from culverts and

nullahs (cubic yards)

...

4,171

80,290

8,692

93,153

SEWERAGE AND SEWAGE DISPOSAL

6.04. The Sewer Duplication Section was formed during the year with the task of investigating the existing sewerage systems and design- ing the improvements necessary to transport and treat the increased