1963-1964 — Page 54

Public Works Department Annual Report 工務司署年報 All AI Reviewed

Page

Yuen Long Flood Control and Dual Carriageway

View of Yuen Long showing new drainage channels (para. 6.10) and new dual carriageway to Ping Shan (para. 9.24). Inset shows the new road bridge across a 110-foot concrete-lined channel.

Page

Edit History

2026-05-11 22:44:59 · NVIDIA / meta/llama-4-maverick-17b-128e-instruct
Live
View comparison
AI Proofread
Page Yuen Long Flood Control and Dual Carriageway View of Yuen Long showing new drainage channels (para. 6.10) and new dual carriageway to Ping Shan (para. 9.24). Inset shows the new road bridge across a 110-foot concrete-lined channel. Page
Baseline (Original)
Pag Yuen Long Flood Control and Dual Carriageway View of Yuen Long showing new drainage channels (para. 6.10) and new dual carriageway to Ping Shan (para. 9.24). Inset shows the new road bridge across a 110-foot concrete-lined channel. Page
2026-05-11 22:44:59 · Baseline
View content

Pag

Yuen Long Flood Control and Dual Carriageway

View of Yuen Long showing new drainage channels (para. 6.10) and new dual carriageway to Ping Shan (para. 9.24). Inset shows the new road bridge across a 110-foot concrete-lined channel.

Page

Comments

Approved members can add comments, bookmarks, and private notes.

No comments yet.

Private Research Note

Private notes are available after approval.