Page 100. Tonkin Street Resettlement Flats. A further site was made available for a single block of Resettlement flats in November. After piling had been completed in January, building of the superstructure commenced in February—and by the end of March the seven-storey building was 75 per cent completed.

101. In the completed block the total number of rooms will be 840.

102. Resettlement Office, Ho Mun Tin. A two-storied semi-permanent office block for Resettlement staff was commenced at Ho Mun Tin in May, and was completed in September. The building has brick load-bearing walls, precast reinforced concrete first floor slab and a timber roof.

Royal Hong Kong Defence Force

103. New Headquarters, R.N.V.R. This seven-storey building overlooking the harbour in Gloucester Road has been referred to in detail in previous reports.

104. It was completed in July.

105. Magazine and Drill Shed, Force Headquarters. A magazine for the storage of ammunition was commenced in January, and at the end of March was nearing completion.

106. A drill shed 90 feet long and 70 feet wide was also commenced in January. It is designed with open sides, asbestos roof and the whole is of steel-framed construction. It is sited on the existing parade ground.

107. Signal Stores, Force Headquarters. Working drawings were completed for a single-storey reinforced concrete store for signal equipment.

Page 17

Edit History

2026-05-11 20:02:18 · NVIDIA / meta/llama-4-maverick-17b-128e-instruct
Live
View comparison
AI Proofread
Page 100. Tonkin Street Resettlement Flats. A further site was made available for a single block of Resettlement flats in November. After piling had been completed in January, building of the superstructure commenced in February—and by the end of March the seven-storey building was 75 per cent completed. 101. In the completed block the total number of rooms will be 840. 102. Resettlement Office, Ho Mun Tin. A two-storied semi-permanent office block for Resettlement staff was commenced at Ho Mun Tin in May, and was completed in September. The building has brick load-bearing walls, precast reinforced concrete first floor slab and a timber roof. Royal Hong Kong Defence Force 103. New Headquarters, R.N.V.R. This seven-storey building overlooking the harbour in Gloucester Road has been referred to in detail in previous reports. 104. It was completed in July. 105. Magazine and Drill Shed, Force Headquarters. A magazine for the storage of ammunition was commenced in January, and at the end of March was nearing completion. 106. A drill shed 90 feet long and 70 feet wide was also commenced in January. It is designed with open sides, asbestos roof and the whole is of steel-framed construction. It is sited on the existing parade ground. 107. Signal Stores, Force Headquarters. Working drawings were completed for a single-storey reinforced concrete store for signal equipment. Page 17
Baseline (Original)
;; Page 100. Tonkin Street Resettlement Flats. A further site was made available for a single block of Resettlement flats in November. After piling had been completed in January, building of the superstructure commenced in February--and by the end of March the seven-storey building was 75 per cent completed. 101. In the completed block the total number of rooms will be 840. 102. Resettlement Office, Ho Mun Tin. A two storied semi-permanent office block for Resettlement staff was com- menced at Ho Mun Tin in May, and was completed in September. The building has brick load bearing walls, precast reinforced concrete first floor slab and a timber roof. Royal Hong Kong Defence Force 103. New Headquarters, R.N.V.R. This seven-storey build- ing overlooking the harbour in Gloucester Road has been referred to in detail in previous reports. 104. It was completed in July. A 105. Magazine and Drill Shed, Force Headquarters. magazine for the storage of ammunition was commenced in January, and at the end of March was nearing completion. 106. A drill shed 90 feet long and 70 feet wide was also commenced in January. It is designed with open sides, asbestos roof and the whole is of steel framed construction. It is sited on the existing parade ground. 107. Signal Stores, Force Headquarters. Working draw- ings were completed for a single-storey reinforced concrete store for signal equipment. 17 ...
2026-05-11 20:02:18 · Baseline
View content

;;

Page

100. Tonkin Street Resettlement Flats. A further site was made available for a single block of Resettlement flats in November. After piling had been completed in January, building of the superstructure commenced in February--and by the end of March the seven-storey building was 75 per cent completed.

101. In the completed block the total number of rooms will be 840.

102. Resettlement Office, Ho Mun Tin. A two storied semi-permanent office block for Resettlement staff was com- menced at Ho Mun Tin in May, and was completed in September. The building has brick load bearing walls, precast reinforced concrete first floor slab and a timber roof.

Royal Hong Kong Defence Force

103. New Headquarters, R.N.V.R.

This seven-storey build-

ing overlooking the harbour in Gloucester Road has been referred to in detail in previous reports.

104. It was completed in July.

A

105. Magazine and Drill Shed, Force Headquarters. magazine for the storage of ammunition was commenced in January, and at the end of March was nearing completion.

106. A drill shed 90 feet long and 70 feet wide was also commenced in January. It is designed with open sides, asbestos roof and the whole is of steel framed construction. It is sited on the existing parade ground.

107. Signal Stores, Force Headquarters. Working draw- ings were completed for a single-storey reinforced concrete store for signal equipment.