Page 100. Tonkin Street Resettlement Flats. A further site was made available for a single block of Resettlement flats in November. After piling had been completed in January, building of the superstructure commenced in February—and by the end of March the seven-storey building was 75 per cent completed.
101. In the completed block the total number of rooms will be 840.
102. Resettlement Office, Ho Mun Tin. A two-storied semi-permanent office block for Resettlement staff was commenced at Ho Mun Tin in May, and was completed in September. The building has brick load-bearing walls, precast reinforced concrete first floor slab and a timber roof.
Royal Hong Kong Defence Force
103. New Headquarters, R.N.V.R. This seven-storey building overlooking the harbour in Gloucester Road has been referred to in detail in previous reports.
104. It was completed in July.
105. Magazine and Drill Shed, Force Headquarters. A magazine for the storage of ammunition was commenced in January, and at the end of March was nearing completion.
106. A drill shed 90 feet long and 70 feet wide was also commenced in January. It is designed with open sides, asbestos roof and the whole is of steel-framed construction. It is sited on the existing parade ground.
107. Signal Stores, Force Headquarters. Working drawings were completed for a single-storey reinforced concrete store for signal equipment.