The following are particulars of the additional areas laid with improved surfacing during the year:-

1. Tarring and sanding

2. 21″ granolithic paving slabs laid on footways

3. Substitution of granite setts for macadam or concrete

4. Substitution of asphaltic sand-carpeting laid on concrete for ordinary macadam

5. Substitution of tar macadam for ordinary macadam

Square Yards.

36,420

7,436

58

43,150

2,130

Estimates $125,000.00

Expenditure $124,148.03

42. Maintenance of Roads and Bridges Outside City. Improvements to Roads and Bridges Outside City. Approximately 90 miles of roads.--The road surfaces were maintained in a satisfactory condition.

Additional parapet walls were erected at dangerous points on Pokfulam Road. A portion of Coombe Road was widened to admit of motor traffic.

A large amount of concrete channelling, surfacing scavenging lanes and reconditioning of road-surfacing were carried out at Tai Hang, Sai Wan Ho, Shaukiwan and Barker Road.

The following are particulars of the improved surfacing introduced on a number of roads in addition to those mentioned in previous reports:

(1). Tarring and sanding

(2). "21″ granolithic paving slabs laid on footways

(3). Substitution of tar macadam for ordinary macadam

Square yards.

15,211

764

7,200

Estimates $136,000.00

Expenditure $116,016.70

Edit History

2026-05-11 12:35:10 · NVIDIA / meta/llama-4-maverick-17b-128e-instruct
Live
View comparison
AI Proofread
P.W.R. Hong Kong. 30 The following are particulars of the additional areas laid with improved surfacing during the year:- 1. Tarring and sanding 2. 21″ granolithic paving slabs laid on footways 3. Substitution of granite setts for macadam or concrete 4. Substitution of asphaltic sand-carpeting laid on concrete for ordinary macadam 5. Substitution of tar macadam for ordinary macadam Square Yards. 36,420 7,436 58 43,150 2,130 Estimates $125,000.00 Expenditure $124,148.03 42. Maintenance of Roads and Bridges Outside City. Improvements to Roads and Bridges Outside City. Approximately 90 miles of roads.--The road surfaces were maintained in a satisfactory condition. Additional parapet walls were erected at dangerous points on Pokfulam Road. A portion of Coombe Road was widened to admit of motor traffic. A large amount of concrete channelling, surfacing scavenging lanes and reconditioning of road-surfacing were carried out at Tai Hang, Sai Wan Ho, Shaukiwan and Barker Road. The following are particulars of the improved surfacing introduced on a number of roads in addition to those mentioned in previous reports: (1). Tarring and sanding (2). "21″ granolithic paving slabs laid on footways (3). Substitution of tar macadam for ordinary macadam Square yards. 15,211 764 7,200 Estimates $136,000.00 Expenditure $116,016.70
Baseline (Original)
P.W.R. Hong Kong. 30 The following are particulars of the additional areas laid with improved surfacing during the year:- 1. Tarring and sanding 2. 21′′ granolithic paving slabs laid on footways 3. Substitution of granite setts for macadam or concrete 4. Substitution of asphaltic sand- carpeting laid Square Yards. 36,420 7,436 58 on concrete for ordinary macadam 43,150 5. Substitution of tar macadam for ordinary macadam 2,130 Estimates $125,000.00 Expenditure $124,148.03 42. Maintenance of Roads and Bridges Outside City. Improvements to Roads and Bridges Outside City. Approximately 90 miles of roads.--The road surfaces were main- tained in a satisfactory condition. Additional parapet walls were erected at dangerous points on Pokulam Road. A portion of Coombe Road was widened to admit of motor traffic. A large amount of concrete channelling, surfacing scavenging lanes and reconditioning of road-surfacing were carried out at Tai Hang, Sai Wan Ho, Shaukiwan and Barker Road. The following are particulars of the improved surfacing in- troduced on a number of roads in addition to those mentioned in previous reports: (1). Tarring and sanding (2). "21" granolithic paving slabs į. laid on footways (3). Substitution of tar macadam for ordinary macadam Square yards. 15,211 764 Estimates Expenditure 7,200 $136,000.00 ,000.00 $116,016.70
2026-05-11 12:35:10 · Baseline
View content

P.W.R. Hong Kong.

30

The following are particulars of the additional areas laid with improved surfacing during the year:-

1. Tarring and sanding

2. 21′′ granolithic paving slabs laid

on footways

3. Substitution of granite setts for

macadam or concrete

4. Substitution of asphaltic sand-

carpeting laid

Square Yards.

36,420

7,436

58

on concrete for

ordinary macadam

43,150

5. Substitution of tar macadam for

ordinary macadam

2,130

Estimates

$125,000.00

Expenditure

$124,148.03

42. Maintenance of Roads and Bridges Outside City. Improvements to Roads and Bridges Outside City. Approximately 90 miles of roads.--The road surfaces were main- tained in a satisfactory condition.

Additional parapet walls were erected at dangerous points on Pokulam Road. A portion of Coombe Road was widened to admit of motor traffic.

A large amount of concrete channelling, surfacing scavenging lanes and reconditioning of road-surfacing were carried out at Tai Hang, Sai Wan Ho, Shaukiwan and Barker Road.

The following are particulars of the improved surfacing in- troduced on a number of roads in addition to those mentioned in previous reports:

(1). Tarring and sanding

(2). "21" granolithic paving slabs

į.

laid on footways

(3). Substitution of tar macadam

for ordinary macadam

Square yards.

15,211

764

Estimates

Expenditure

7,200

$136,000.00

,000.00

$116,016.70