P.W.R. Hong Kong.

30

The following are particulars of the additional areas laid with improved surfacing during the year:-

1. Tarring and sanding

2. 21″ granolithic paving slabs laid on footways

3. Substitution of granite setts for macadam or concrete

4. Substitution of asphaltic sand-carpeting laid on concrete for ordinary macadam

5. Substitution of tar macadam for ordinary macadam

Square Yards.

36,420

7,436

58

43,150

2,130

Estimates $125,000.00

Expenditure $124,148.03

42. Maintenance of Roads and Bridges Outside City. Improvements to Roads and Bridges Outside City. Approximately 90 miles of roads.--The road surfaces were maintained in a satisfactory condition.

Additional parapet walls were erected at dangerous points on Pokfulam Road. A portion of Coombe Road was widened to admit of motor traffic.

A large amount of concrete channelling, surfacing scavenging lanes and reconditioning of road-surfacing were carried out at Tai Hang, Sai Wan Ho, Shaukiwan and Barker Road.

The following are particulars of the improved surfacing introduced on a number of roads in addition to those mentioned in previous reports:

(1). Tarring and sanding

(2). "21″ granolithic paving slabs laid on footways

(3). Substitution of tar macadam for ordinary macadam

Square yards.

15,211

764

7,200

Estimates $136,000.00

Expenditure $116,016.70