1964_WATER_POLLUTION_CONTROL_(GENERAL)_REGULATIONS — Page 36

HK Historical Laws 香港歷史法例 All AI Reviewed

D 36

CAP. 358]

Water Pollution Control (General) Regulations

[1988 Ed.

[Subsidiary]

C2.

Estimate the following determinands of the proposed discharge or deposit after treatment. State the source of data upon which the estimates are based.

Determinand Unit Mean Minimum Maximum

5-day biochemical oxygen demand mg/L

Chemical oxygen demand mg/L

Suspended solids mg/L

Oil and grease mg/L

Heavy metals (specify below) mg/L

Temperature °C

pH

Colour

Source of data

Specify any heavy metals included above

C3.

List raw materials to be used in the industrial process to be carried on on the premises and their total quantities likely to be used over a period of 12 months.

Item No. Material Quantity to be used over 12 months

(i)

(ii)

(iii)

(iv)

(v)

(vi)

(vii)

33

Edit History

2026-05-05 16:32:54 · NVIDIA / meta/llama-4-maverick-17b-128e-instruct
Live
View comparison
AI Proofread
D 36 CAP. 358] Water Pollution Control (General) Regulations [1988 Ed. [Subsidiary] C2. Estimate the following determinands of the proposed discharge or deposit after treatment. State the source of data upon which the estimates are based. Determinand Unit Mean Minimum Maximum 5-day biochemical oxygen demand mg/L Chemical oxygen demand mg/L Suspended solids mg/L Oil and grease mg/L Heavy metals (specify below) mg/L Temperature °C pH Colour Source of data Specify any heavy metals included above C3. List raw materials to be used in the industrial process to be carried on on the premises and their total quantities likely to be used over a period of 12 months. Item No. Material Quantity to be used over 12 months (i) (ii) (iii) (iv) (v) (vi) (vii) 33
Baseline (Original)
D 36 CAP. 358] Water Pollution Control (General) Regulations [1988 Ed. [Subsidiary] C2. Estimate the following determinands of the proposed discharge or deposit after treatment. State the source of data upon which the estimates are based. Determinand Unit Mean Minimum Maximum 5-day biochemical oxygen demand mg/L Chemical oxygen demand mg/L Suspended solids mg/L Oil and grease mg/L Heavy metals (specify below) mg/L Temperature *C pH Colour Source of data Specify any heavy metals included above C3. List raw materials to be used in the industrial process to be carried on on the pemises and their total quantities likely to be used over a period of 12 months- Item No. Material (ii) (ii) (iv) 33 (v) (vi) (vii) Quantity to be used over 12 months
2026-05-05 16:32:54 · Baseline
View content

D 36

CAP. 358]

Water Pollution Control (General) Regulations

[1988 Ed.

[Subsidiary]

C2.

Estimate the following determinands of the proposed discharge or deposit after treatment. State the source of data upon which the estimates are based.

Determinand

Unit Mean Minimum

Maximum

5-day biochemical

oxygen demand

mg/L

Chemical oxygen

demand

mg/L

Suspended solids

mg/L

Oil and grease

mg/L

Heavy metals

(specify below)

mg/L

Temperature

*C

pH

Colour

Source of data

Specify any heavy metals included above

C3.

List raw materials to be used in the industrial process to be carried on on the pemises and their total quantities likely to be used over a period of 12 months-

Item No.

Material

(ii)

(ii)

(iv)

33

(v)

(vi)

(vii)

Quantity to be used over 12 months

Comments

Approved members can add comments, bookmarks, and private notes.

No comments yet.

Private Research Note

Private notes are available after approval.