1988 Ed.]
Water Pollution Control (General) Regulations
[CAP. 358
D 35
[Subsidiary]
SECTION B. DETAILS OF INDUSTRIAL PROCESS AND OF
PROPOSED DISCHARGE OR DEPOSIT
Bl.
B2.
B3.
B4.
B5.
B6.
B7.
Describe industrial process from which proposed discharge or deposit will arise. Attach flow chart or diagram if necessary.
State at how many discharge points the discharge or deposit from the premises will enter-
(a) the waters of Hong Kong; or
(b) a public drain or public sewer.
In respect of each proposed discharge point give particulars of the point at which the discharge or deposit enters the waters of Hong Kong or a public drain or public sewer.
Describe every proposed discharge point in terms of dimensions, material, presence or absence of diffuser, etc.
Describe any method of treatment to be applied to the discharge or deposit-
(a) before it leaves the premises;
(b) between leaving the premises and reaching a discharge point, and state the effluent standards which the treatment is designed to achieve.
If there is to be a plant on the premises for treating industrial waste from the premises, describe any standby facilities which will be available in the event of breakdown of the plant.
Specify one or more points on the proposed premises at which samples of any discharge or deposit from the premises may be taken by the Authority as being representative of the quality and quantity of the discharge or deposit.
Will flow rates of the discharge or deposit be measured?
B8.
/YES NO
If yes, state proposed method of measurement
B9.
Will the discharge or deposit be continuous or intermittent?
Continuous Intermittent
If intermittent, state the period during which the discharge or deposit is made on a working day. If the period varies from day to day or seasonally, describe how.
SECTION C. DETERMINANDS, RAW MATERIALS AND
COMPONENTS
CI. Will determinands of the discharge or deposit be measured?
YES NO
If yes, list determinands which will be measured
Page 35
Page 36
1988 Ed.]
Water Pollution Control (General) Regulations
[CAP. 358
D 35
[Subsidiary]
SECTION B. DETAILS OF INDUSTRIAL PROCESS AND OF
PROPOSED DISCHARGE OR DEPOSIT
Bl.
B2.
B3.
B4.
B5.
B6.
B7.
Describe industrial process from which proposed discharge or deposit will arise. Attach flow chart or diagram if necessary.
or dep
State at how many discharge points the discharge or deposit from the premises will enter-
(a) the waters of Hong Kong; or
(b) a public drain or public sewer.
In respect of each proposed discharge point give particulars of the point at which the discharge or deposit enters the waters of Hong Kong or a public drain or public sewer/
Describe every proposed discharge/point in terms of dimensions, material, presence or absence of diffuser, etc.
Describe any method of treatment to be applied to the discharge or deposit-
(a) before it leaves the premises;
(b) between leaving the premises and reaching a discharge point, and state the effluent standards which the treatment is designed to achieve.
If there is to be a plant on the premises for treating industrial waste from the premises, describe any standby facilities which will be available in the event of breakdown of the plant.
Specify one or more points on the proposed premises at which samples of any discharge or deposit from the premises may be taken by the Authority as being representative of the quality and quantity of the discharge or deposit.
Will flow rates of the discharge or deposit be measured?
B8.
D
/YES
NO
If yes, state proposed method of measurement
B9.
Will the discharge or deposit be continuous or intermittent?
Continuous
Intermittent
If intermittent, state the period during which the discharge or deposit is made on a working day. If the period varies from day to day or seasonally, describe how.
SECTION C. DETERMINANDS, RAW MATERIALS AND
COMPONENTS
CI. Will determinands of the discharge or deposit be measured?
YES
NO
If yes, list determinands which will be measured
:
Page 35Page 36
No comments yet.
Private notes are available after approval.