1964_WATER_POLLUTION_CONTROL_(GENERAL)_REGULATIONS — Page 18

HK Historical Laws 香港歷史法例 All AI Reviewed

D 18

CAP. 358]

Water Pollution Control (General) Regulations

[1988 Ed.

[Subsidiary]

D3.

D4.

(a) State the total amount of non-mains water (i.e. other than that specified in Section D2) used at the premises in the 12 months prior to FAD or in the period between commencement of the discharge or deposit and FAD, whichever is the shorter, in m3, litres or gallons (see note to section D2(b)).

(b) State the source of all non-mains water and the method used for measurement of its volume.

Of total water used at the premises, estimate the following (estimates should be averages over the 12 months prior to the First Appointed Day)-

(i) Amount lost in evaporation (ii) Amount lost in product

Total of (i) and (ii) above

SECTION E. DECLARATION

E1.

E2.

% of total water usage;

% of total water usage.

% of total water usage.

I/We hereby certify that the particulars given above are, to the best of my/our knowledge and belief, correct.

*I/We intend to apply to the Secretary under section 43 of the Ordinance to withhold from public notification or other public access the information contained in a section or sections of this Form, namely-

* Delete if inapplicable.

Signature/s

Name/s

(Block letters)

NOTIFIER

MANAGER OF INDUSTRIAL ENTERPRISE (If not the notifier)

Date

SECTION F. LOCATION OF INDUSTRIAL PREMISES, OF DISCHARGE POINT AND OF PROPOSED SAMPLING POINT

F1.

Draw in the space provided, or on a separate sheet, a sketch plan, as nearly as possible to scale, showing the location of the industrial premises or of the building in which they are situated (if premises are part of a larger building). On the plan-

(a) show the relationship of the premises or building to the nearest major road intersection, and name the roads; or show the relationship of the premises or building to a readily identifiable landmark;

(b) show any public drain, public sewer, or waters of Hong Kong adjacent to the premises or building, and

(c) mark the location of every discharge point.

F2. Draw in the space provided, or on a separate sheet, a second sketch plan, as nearly as possible to scale, showing the layout of the industrial premises. On the plan-

(a) show the location of any on-site treatment plant;

(b) mark the location of every proposed sampling point.

Edit History

2026-05-05 16:30:18 · NVIDIA / meta/llama-4-maverick-17b-128e-instruct
Live
View comparison
AI Proofread
D 18 CAP. 358] Water Pollution Control (General) Regulations [1988 Ed. [Subsidiary] D3. D4. (a) State the total amount of non-mains water (i.e. other than that specified in Section D2) used at the premises in the 12 months prior to FAD or in the period between commencement of the discharge or deposit and FAD, whichever is the shorter, in m3, litres or gallons (see note to section D2(b)). (b) State the source of all non-mains water and the method used for measurement of its volume. Of total water used at the premises, estimate the following (estimates should be averages over the 12 months prior to the First Appointed Day)- (i) Amount lost in evaporation (ii) Amount lost in product Total of (i) and (ii) above SECTION E. DECLARATION E1. E2. % of total water usage; % of total water usage. % of total water usage. I/We hereby certify that the particulars given above are, to the best of my/our knowledge and belief, correct. *I/We intend to apply to the Secretary under section 43 of the Ordinance to withhold from public notification or other public access the information contained in a section or sections of this Form, namely- * Delete if inapplicable. Signature/s Name/s (Block letters) NOTIFIER MANAGER OF INDUSTRIAL ENTERPRISE (If not the notifier) Date SECTION F. LOCATION OF INDUSTRIAL PREMISES, OF DISCHARGE POINT AND OF PROPOSED SAMPLING POINT F1. Draw in the space provided, or on a separate sheet, a sketch plan, as nearly as possible to scale, showing the location of the industrial premises or of the building in which they are situated (if premises are part of a larger building). On the plan- (a) show the relationship of the premises or building to the nearest major road intersection, and name the roads; or show the relationship of the premises or building to a readily identifiable landmark; (b) show any public drain, public sewer, or waters of Hong Kong adjacent to the premises or building, and (c) mark the location of every discharge point. F2. Draw in the space provided, or on a separate sheet, a second sketch plan, as nearly as possible to scale, showing the layout of the industrial premises. On the plan- (a) show the location of any on-site treatment plant; (b) mark the location of every proposed sampling point.
Baseline (Original)
D 18 CAP. 358] Water Pollution Control (General) Regulations [1988 Ed. [Subsidiary] D3. D4. (a) State the total amount of non-mains water (i.e. other than that specified in Section D2) used at the premises in the 12 months prior to FAD or in the period between commencement of the discharge or deposit and FAD, whichever is the shorter, in m3, litres or gallons (see note to section D2(b)). (b) State the source of all non-mains water and the method used for measurement of its volume. Of total water used at the premises, estimate the following (estimates should be averages over the 12 months prior to the First Appointed Day)- (i) Amount lost in evaporation (ii) Amount lost in product Total of (i) and (ii) above SECTION E. DEĢLARATION El. E2. % of total water usage; % of total water usage. % of total water usage. I/We hereby certify that the particulars given above are, to the best of my/our knowledge and belief, correct. *I/We intend to apply to the Secretary under section 43 of the Ordinance to withhold from public notification or other public access the information contained in a section or sections of this Form, namely- * Delete if inapplicable. Signature/s Name/s (Block letters) NOTIFIER MANAGER OF INDUSTRIAL ENTERPRISE (If not the notifier) Date SECTION F. LOCATION OF INDUSTRIAL PREMISES, OF DISCHARGE POINT AND OF PROPOSED SAMPLING POINT Fl. Draw in the space provided, or on a separate sheet, a sketch plan, as nearly as possible to scale, showing the location of the industrial premises or of the building in which they are situated (if premises are part of a larger building). On the plan- (a) show the relationship of the premises or building to the nearest major road intersection, and name the roads; or show the relationship of the premises or building to a readily identifiable landmark; (b) show any public drain, public sewer, or waters of Hong Kong adjacent to the premises or building, and (c) mark the location of every discharge point. F2. Draw in the space provided, or on a separate sheet, a second sketch plan, as nearly as possible to scale, showing the layout of the industrial premises. On the plan- (a) show the location of any on-site treatment plant; (b) mark the location of every proposed sampling point.
2026-05-05 16:30:18 · Baseline
View content

D 18

CAP. 358]

Water Pollution Control (General) Regulations

[1988 Ed.

[Subsidiary]

D3.

D4.

(a) State the total amount of non-mains water (i.e. other than that specified in Section D2) used at the premises in the 12 months prior to FAD or in the period between commencement of the discharge or deposit and FAD, whichever is the shorter, in m3, litres or gallons (see note to section D2(b)).

(b) State the source of all non-mains water and the method used

for measurement of its volume.

Of total water used at the premises, estimate the following (estimates should be averages over the 12 months prior to the First Appointed Day)-

(i) Amount lost in evaporation (ii) Amount lost in product

Total of (i) and (ii) above

SECTION E. DEĢLARATION

El.

E2.

% of total water usage;

% of total water usage.

% of total water usage.

I/We hereby certify that the particulars given above are, to the best of my/our knowledge and belief, correct.

*I/We intend to apply to the Secretary under section 43 of the Ordinance to withhold from public notification or other public access the information contained in a section or sections of this Form, namely-

* Delete if inapplicable.

Signature/s

Name/s

(Block letters)

NOTIFIER

MANAGER OF INDUSTRIAL ENTERPRISE (If not the notifier)

Date

SECTION F. LOCATION OF INDUSTRIAL PREMISES, OF

DISCHARGE POINT AND OF PROPOSED SAMPLING POINT

Fl.

Draw in the space provided, or on a separate sheet, a sketch plan, as nearly as possible to scale, showing the location of the industrial premises or of the building in which they are situated (if premises are part of a larger building). On the plan-

(a) show the relationship of the premises or building to the nearest major road intersection, and name the roads; or show the relationship of the premises or building to a readily identifiable landmark;

(b) show any public drain, public sewer, or waters of Hong Kong

adjacent to the premises or building, and

(c) mark the location of every discharge point.

F2. Draw in the space provided, or on a separate sheet, a second sketch plan, as nearly as possible to scale, showing the layout of the industrial premises. On the plan-

(a) show the location of any on-site treatment plant;

(b) mark the location of every proposed sampling point.

Comments

Approved members can add comments, bookmarks, and private notes.

No comments yet.

Private Research Note

Private notes are available after approval.