1988 Ed.]
Water Pollution Control (General) Regulations
[CAP. 358
D 17
[Subsidiary]
C4.
List all components of the discharge or deposit that may be volatile, inflammable or toxic. Estimate the concentration of each such component and state the source of data on which the estimates are based--
Concentration in discharge or deposit
Component Unit Mean Minimum Maximum Source of data
SECTION D. WATER USAGE
D1
Specify water account number(s) for the industrial premises
(a) Give the dates and figures for all readings of the meter(s) installed in connection with the water account number(s) specified in Section D1 and taken by the Water Authority in the 12 months prior to the First Appointed Day (FAD) or in the period between commencement of the discharge or deposit and FAD, whichever is the shorter-
Date Reading
(b) State the total amount of water supplied by the Water Authority to the premises in the 12 months prior to FAD or in the period between commencement of the discharge or deposit and FAD, whichever is the shorter, in m3, litres or gallons (Note: One meter unit = 4.546 m3; one m3 = 1000 litres; one gallon = 4.546 litres).
1988 Ed.]
Water Pollution Control (General) Regulations
[CAP. 358
D 17
[Subsidiary]
C4.
List all components of the discharge or deposit that may be volatile, inflammable or toxic. Estimate the concentration of each such component and state the source of data on which the estimates are based--
Concentration in discharge
or deposit
Component
Unit
Mean
Minimum
Source of data
Maximum
SECTION D. WATER USAGE
DZ
Specify water account number(s) for the industrial premises
(a) Give the dates and figures for all readings of the meter(s) installed in connection with the water account number(s) specified in Section D1 and taken by the Water Authority in the 12 months prior to the First Appointed Day (FAD) or in the period between commencement of the discharge or deposit and FAD, whichever is the shorter-
Date
Reading
(b) State the total amount of water supplied by the Water Authority to the premises in the 12 months prior to FAD or in the period between commencement of the discharge or deposit and FAD, whichever is the shorter, in m3, litres or gallons (Note: One meter unit=4.546m3; one m3-1000 litres; one gallon 4.546 litres).
No comments yet.
Private notes are available after approval.