1989 Ed.]
Waterworks Regulations
[CAP. 102
A 23
5.
6.
For any
[Subsidiary]
For each
length of 30
metres and below
metre or part of a metre in excess of 30
Under regulations 28(2), 30(3) and 32(2):
Testing a meter or a private check meter (including removal and refixing)-
(a) any size up to and including 80 mm in diameter
$ 300.00
(b) above 80 mm in diameter up to and including 100 mm in diameter
metres
$ 700.00
(c) above 100 mm in diameter up to and including 150 mm in diameter $1,150.00
(d) above 150 mm in diameter up to and including 200 mm in diameter $1,400.00
Under regulation 34(1) and (2):
Plumber's licence
7.
Under regulation 34(2B):
Plumbers' licence examination
8.
Under regulation 34(3):
Renewal of plumber's licence
9.
Under regulation 42:
Fishing licence
PART II
$ 40.00
$ 400.00
$ 30.00
$ 20.00
SUPERVISION CHARGE
(Regulation 8)
The charge for supervision of work carried out by the Water Authority, other than work for which a fee is prescribed in this Schedule, shall be 20% of the actual cost of such work.
PART III
CHARGE FOR FRESH WATER
(Regulation 46)
1. The charge for fresh water, filtered or unfiltered, per unit of 1 cubic metre (1,000 litres) shall be
Charge per unit
(a) for construction purposes
$4.13
(b) for domestic purposes (other than flushing), per 4 month period-
(i) for the first 17 units
Nil
(ii) for the next 17 units
$1.47
(iii) for the next 26 units
$2.66
(iv) for the next 26 units
$4.13
(v) for the remainder
(i) for the first 30 units
(ii) for the remainder
$5.79
(c) for flushing purposes, per 4 month period-
Nil
$2.66
$
1989 Ed.]
Waterworks Regulations
[CAP. 102
A 23
5.
6.
For any
[Subsidiary]
For each
length of 30
metres and below
metre or part of a metre in excess of 30
Under regulations 28(2), 30(3) and 32(2):
Testing a meter or a private check meter (including removal and refixing)-
(a) any size up to and including 80 mm in diameter
(b) above 80 mm in diameter up to and including 100 mm in diameter
metres
$ 300.00
$ 700.00
(c) above 100 mm in diameter up to and including 150 mm in diameter $1,150.00
(d) above 150 mm in diameter up to and including 200 mm in diameter $1,400.00
Under regulation 34(1) and (2):
Plumber's licence
7.
Under regulation 34(2B):
Plumbers' licence examination
8.
Under regulation 34(3):
Renewal of plumber's licence
9.
Under regulation 42:
Fishing licence
PART II
$ 40.00
$ 400.00
$
30.00
$ 20.00
SUPERVISION CHARGE
(Regulation 8)
The charge for supervision of work carried out by the Water Authority, other than work for which a fee is prescribed in this Schedule, shall be 20% of the actual cost of such work.
PART III
CHARGE FOR FRESH WATER
(Regulation 46)
1. The charge for fresh water, filtered or unfiltered, per unit of 1 cubic metre (1 000 litres) shall
be
Charge per unit
(a) for construction purposes
$4.13
(b) for domestic purposes (other than flushing), per 4 month period-
(i) for the first 17 units
SNIL
(ii) for the next 17 units
$1.47
(iii) for the next 26 units
$2.66
(iv) for the next 26 units
$4.13
(v) for the remainder
(i) for the first 30 units
(ii) for the remainder
$5.79
(c) for flushing purposes, per 4 month period-
SNIL
$2.66
No comments yet.
Private notes are available after approval.