1989 Ed.]

Waterworks Regulations

[CAP. 102

A 23

5.

6.

For any

[Subsidiary]

For each

length of 30

metres and below

metre or part of a metre in excess of 30

Under regulations 28(2), 30(3) and 32(2):

Testing a meter or a private check meter (including removal and refixing)-

(a) any size up to and including 80 mm in diameter

$ 300.00

(b) above 80 mm in diameter up to and including 100 mm in diameter

metres

$ 700.00

(c) above 100 mm in diameter up to and including 150 mm in diameter $1,150.00

(d) above 150 mm in diameter up to and including 200 mm in diameter $1,400.00

Under regulation 34(1) and (2):

Plumber's licence

7.

Under regulation 34(2B):

Plumbers' licence examination

8.

Under regulation 34(3):

Renewal of plumber's licence

9.

Under regulation 42:

Fishing licence

PART II

$ 40.00

$ 400.00

$ 30.00

$ 20.00

SUPERVISION CHARGE

(Regulation 8)

The charge for supervision of work carried out by the Water Authority, other than work for which a fee is prescribed in this Schedule, shall be 20% of the actual cost of such work.

PART III

CHARGE FOR FRESH WATER

(Regulation 46)

1. The charge for fresh water, filtered or unfiltered, per unit of 1 cubic metre (1,000 litres) shall be

Charge per unit

(a) for construction purposes

$4.13

(b) for domestic purposes (other than flushing), per 4 month period-

(i) for the first 17 units

Nil

(ii) for the next 17 units

$1.47

(iii) for the next 26 units

$2.66

(iv) for the next 26 units

$4.13

(v) for the remainder

(i) for the first 30 units

(ii) for the remainder

$5.79

(c) for flushing purposes, per 4 month period-

Nil

$2.66

Share This Page