1989 Ed.]
Noise Control (General) Regulations
[CAP. 400
A 11
[Subsidiary]
5.
4c. Piling method and pile type combination for which the construction noise permit is required. If applicable, reference should be made to Table 2-Source Sound Power Levels for Percussive Piling, contained in the Technical Memorandum on Noise from Percussive Piling.
Piling method and pile type
No. of units
Additional information
5a. Specify any particularly quiet percussive piling methods or any special noise control measures to be employed on site, or any other special factors or exceptional circumstances which are thought to be relevant.
5b. Give any additional information which is thought to be relevant to this application.
Dated this
day of
19
Signed:
Applicant.
Please note:
1.
2.
3.
The applicant is advised to read the Noise Control Ordinance, the Noise Control (General) Regulations and the Technical Memorandum on Noise from Percussive Piling before submitting this application. The Authority shall be guided by the Technical Memorandum in considering an application.
Section 8(4) of the Ordinance provides that not later than 28 days after an application is received by the Authority, he shall issue a construction noise permit or serve on the applicant written notice of his refusal to issue the permit, and if at the end of those 28 days he has done neither of those things a permit shall be deemed to have been issued.
A construction noise permit that is issued in consequence of misleading, false, wrong or incomplete information furnished by an applicant in connection with the application is liable to be cancelled.
4. The fee payable on submission of this application will not be refunded.
1989 Ed.]
Noise Control (General) Regulations
[CAP. 400
A 11
[Subsidiary]
5.
4c. Piling method and pile type combination for which the construction noise permit is required. If applicable, reference should be made to Table 2-Source Sound Power Levels for Percussive Piling, contained in the Technical Memorandum on Noise from Percussive Piling.
Piling method and pile type
No. of units
Additional information
Sa. Specify any particularly quiet percussive piling methods or any special noise control measures to be employed on site, or any other special factors or exceptional circumstances which are thought to be relevant.
5b. Give any additional information which is thought to be relevant to this application.
Dated this
day of
19
Signed:
Applicant.
Please note:
1.
2.
3.
The applicant is advised to read the Noise Control Ordinance, the Noise Control (General) Regulations and the Technical Memorandum on Noise from Percussive Piling before submitting this application. The Authority shall be guided by the Technical Memorandum in considering an application.
Section 8(4) of the Ordinance provides that not later than 28 days after an application is received by the Authority, he shall issue a construction noise permit or serve on the applicant written notice of his refusal to issue the permit, and if at the end of those 28 days he has done neither of those things a permit shall be deemed to have been issued.
A construction noise permit that is issued in consequence of misleading, false, wrong or incomplete information furnished by an applicant in connection with the application is liable to be cancelled.
4. The fee payable on submission of this application will not be refunded.
No comments yet.
Private notes are available after approval.