SWIRE PROPERTIES PROJECTS LTD
ONE PACIFIC PLACE
1992 OPERATION & MAINTENANCE COSTS
:
Building fabric maintenance
Lift repairs & maintenance
Air-conditioning costs
Building services repairs & maintenance
Utility costs
Cleaning
$ 450,000.00
900,000.00
3,600,000.00
2,550,000.00
4,000,000.00
1,450,000.00
850,000 $ 12950, 000,00=15024 for ft2
-$164 per m
ン
(1m2 = 10·76fer)
2
Notes :
1.
PP1 is a tenanced office building
Gross floor area
850,000 £t2
Lettable floor area
760.000 ft2
2.
3.
4.
Gross floor area excludes plant rooms
Lettable floor area includes lift lobbies and toilets
The building is 37 storeys comprising a main lobby and 36 office
floors
External facade is curtain wall
Some tenants occupy whole floors in which case they are responsible for the maintenance of the whole area. Some floors have multiple tenants in which case the Landlord is responsible for the maintenance of the public areas.
Air-conditioning costs are the costs for generating chilled water for tenanted and public areas and include the energy costs and maintenance of the chiller installation.
Building services includes the airside of the air-conditioning.
Utility costs are the energy costs for all building services excluding chilled water but including the airside of the air-conditioning. lifts and escalators, lighting to public areas.
+