LL..

SWIRE PROPERTIES PROJECTS LTD

ONE PACIFIC PLACE

1992 OPERATION & MAINTENANCE COSTS

:

Building fabric maintenance

Lift repairs & maintenance

Air-conditioning costs

Building services repairs & maintenance

Utility costs

Cleaning

$ 450,000.00

900,000.00

3,600,000.00

2,550,000.00

4,000,000.00

1,450,000.00

850,000 $ 12950, 000,00=15024 for ft2

-$164 per m

(1m2 = 10·76fer)

2

Notes :

1.

PP1 is a tenanced office building

Gross floor area

850,000 £t2

Lettable floor area

760.000 ft2

2.

3.

4.

Gross floor area excludes plant rooms

Lettable floor area includes lift lobbies and toilets

The building is 37 storeys comprising a main lobby and 36 office

floors

External facade is curtain wall

Some tenants occupy whole floors in which case they are responsible for the maintenance of the whole area. Some floors have multiple tenants in which case the Landlord is responsible for the maintenance of the public areas.

Air-conditioning costs are the costs for generating chilled water for tenanted and public areas and include the energy costs and maintenance of the chiller installation.

Building services includes the airside of the air-conditioning.

Utility costs are the energy costs for all building services excluding chilled water but including the airside of the air-conditioning. lifts and escalators, lighting to public areas.

+

cont'd.

'd..../2