TNAG-2957-FCO40-4236-Future-of-Hong-Kong-British-Consulate-General-Colvin-House--1993 — Page 62

FCO40 Hong Kong Department Records 聯邦事務部香港部檔案 All

or

current replacement cost or costs of the building or buildings

parts thereof as at the date of resumption; it being fully agreed and understood that separate sums shall be certified in respect of any separate addition or improvement to the building or buildings or parts thereof : Provided always

PROVIDED ALWAYS THAT

IN ARRIVING

AT SUCH

-(i)

SUM, THE DIRECTOR

SHALL ENSURE THAT

HE FULLY

COMPLIES

WITH THE RELEVANT

INTERNATIONAL OBLIGATIONS"

that in the event of the Government having made a financial contribution

100% towards the

addition to or

cost

of

construetion,

improvement of the building or buildings or parts thereof then

no compensation shall be payable in respect of such building buildings or parts thereof resumed.

SUBSISTING AT THE \ii) subject

PATE OF RESUMPTION

IN ACCORDANCE

With

SC No 44 HEREOF.

(3C44 LAYS DOWN THAT

THE GOVERNMENT SHALL

to

*

f

or

(i) above that in the event of the Government having made a financial contribution of less than 100% towards the cost of construction, addition to or improvement of the building

parts thereof then there shall be deducted from the sum certified in (b) above, a separate amount in respect of the construction of or any addition to

ри

buildings

of

improvement parts thereof

or

or

the building or

buildings or which shall be calculated according to the equation set out Kereunder

t

,。 ཀ་

ACT AT ALL

TIMES

CONFORMITY

IN WITH ANY

INTERNATIONAL OBLIGATIONS

THAT MAY

BE APPLICABLE)

where

Parking

spaces

(15)

S =

X

x z

X

Y

{

$

the

amount,

be deducted from the

sum certified in (b) above

the X =

financial

the Government

Construction,

improvement

of

Y

contribution made by

towards the cost of addition to

the building

buildings or parts thereof resumed

the sum which in the opinion of the

Director

has

expended

by

been reasonably the Grantee at the material time or times towards the

construction,

addition

to

improvement of the building buildings or parts thereof resumed

Z

the sum certified in (b) above.

Spaces shall be provided within the lot to the satisfaction of the Director for the parking, loading and unloading of motor vehicles to meet the operational requirements of the lot.

j

2 nd Y 0 A 0

يد

t

Comments

Approved members can add comments, bookmarks, and private notes.

No comments yet.

Private Research Note

Private notes are available after approval.