SCHEDULE OF REQUIREMENTS
POST: CONSULATE - GENERAL HONG KONG
SCHEME: NEW OFFICES
DATE: NOVEMBER 1992
SECTION
OFFICER OR
NO
GRADE
FUNCTION
OF
CLASSI - FICATION
NETT
REMARKS
AREA
STAFF
M2
(1)
(2)
(3)
(4)
(5)
(6)
(7)
U/C
As Necessary
Locate internally.
Provide, ideally, at least
one on each floor.
Q.
ANCILLARY
(1)
Staff
Toilets
(Ladies and Gents)
(2)
Public Toilets &
U/C
Cloakroom
Facilities
(Ladies and Gents)
(3)
Kitchenette/Tea
U/C
Paint
As To cater for public waiting areas including J5 Necessary and J6 and Library and Classrooms. Should be
external to main offices.
(4)
Staff showers
U/C
D
& Changing Rooms
(Ladies and Gents)
H
(5)
Cleaners cupboards
U/C
(6)
Generator room
U/C
(7)
Plant room(s)
U/C
(8)
Staff parking
U/C
11
(9)
Office Parking
(10)
Refuse
collection
facilities
(11)
Satellite Dish
(12)
Visitors Parking
(13)
VIP Drop-off point
(14) Vehicle delivery
points
HONGKONG.SOR
NETT SPACE REQUIREMENTS
Ideally locate on every floor. To cater for staff in main offices and teachers/Lecturers rest room: each facility should be adequate to accommodate fridge, sink plus work surface, kettle point, storage cupboards, worktops and refuse bin.
Locate 1 to cater for Sections A to L and one other to cater for Section P.
U/C
등등
U/C
U/C
As Necessary
=
=
=
등등
20
U/C
U/C
As necessary
U/C
As
Including standby generator.
To cater for 50 UK based, 20 Includes dedicated parking accommodation one per unit.
senior LEs. for staff Provide some
shade and easy pedestrian routes from car park
to CG and BC Offices and staff flats.
To cater for 10 official vehicles, two of which should be under cover.
To cater also for staff accommodation.
Need direct line of sight to either Pacific or Indian Ocean Satellite. Co-ordinates are:
Indian Ocian - AZIMUTH 250°
Pacific
ELEVATION 30°
AZIMUTH 100°
ELEVATION 15°
If practical provide 5 spaces located outside secure perimeter.
Locate inside secure perimeter and easy access to main entrance of CG.
Locate inside secure perimeter and with easy necessary access to service lifts of CG and British
Council.
10,961m2 Excludes sections Q and H5 and L50.