SCHEDULE OF REQUIREMENTS
POST: CONSULATE-GENERAL HONG KONG
SCHEME: NEW OFFICES
DATE: NOVEMBER 1992
SECTION
OFFICER OR
NO
GRADE
FUNCTION
OF
CLASSI- FICATION
NETT AREA
REMARKS
STAFF
M2
(1)
(2)
(3)
(4)
(5)
(6)
(7)
ENGLISH LANGUAGE CENTRE (Location to be easily accessible from (63))
(64)
Director
1
D
U/C
23.0
(65)
Deputy Director
1
E
U/C
18.5
Should be partly glazed for supervision into (67) and (68).
Interconnect with (64)
(66)
Course Managers
LEI/II
U/C
84.0
Open plan area.
(67)
Admin Officer
1
LEII
U/C
9.0
(68)
Secretaries
and 2
LEIII
U/C
51.0
General Office
Colocate with (68)
Includes space for filing cabinets fax, telex, photocopier, stationery and storage.
(69)
Special/Business
U/C
28.0
courses unit
(70)
Training room
(71)
Tr a i ning
room/Conference
(72)
Interview Room
(73)
Interview Room
(73)(a)
Smokers Room
U/C
37.0
U/C
37.0
>
) Locate at Entrance to ELC
U/C
9.0
U/C
9.0
U/C
18.5
Can be located elsewhere if constraints prevent location in ELC.
design/space
(74)
Teachers Union
Office
(75)
Teachers
room
Common
U/C
9.0
U/C
65.0
Provide adjacent kitchenette (see also Q(3)). Can be combined with P87.
AVPU AND RESOURCES (LOCATE ADJACENT TO ENGLISH LANGUAGE CENTRE AND IF POSSIBLE NEAR TO 63)
(76)
Head of Section
1
LEII
U/C
14.0
(77)
AVPU Assistant
1
LEII
U/C
9.0
INTERCONNECT WITH 76
(78)(a)
Resources General 5 Office
LEIIIX1
U/C
37.0
Divide 78(a) and 78(b) by Counter.
LEIV X4
*(78b) Resources Store
U/C
84.0
*(78c)
Repair Shop
U/C
14.0
*(79)
Studio/Recording
-
U/C
74.0
Repair
Includes space for editing and recording equipment. Height spec is 3.25 m.
(79a)
4 X Audio/Video
U/C
34.0
Locate in teachers area (P63)
Stations (90 ft2 each)
(79(b) Machine Area
(79(c)
Tape Store
HONGKONG.SOR
U/C
8.5
U/C
14.0
No comments yet.
Private notes are available after approval.