CONFIDENTIAL
SCHEDULE OF REQUIREMENTS
POST: CONSULATE GENERAL HONG KONG
SCHEME: NEW OFFICES
DATE: NOVEMBER 1992
SECTION
OFFICER OR
NO
GRADE
FUNCTION
OF
CLASSI- FICATION
NETT
AREA
STAFF
M2
(1)
(2)
(3)
(4)
(5)
(6)
REMARKS
(7)
(2)
IDS Alcove
(3)
Reading Room/Area
$
S
(4)
Strong Room
S
(5)
Communications
Equipment room
(6)
IT Systems Room
S
6.0
4.0
14.0
11.0
12.0
Should be an enclosed space within 8(1).
Locate at entrance to B(1) and separated from B(1) by counter barrier. Includes space for shredder and photocopier.
Sole access from B(1). No external walls. 200mm min concrete walls.
Sole access from B1. 24 hr A/C.
Locate off B1. Access by Cambridge Door. 24 hr A/C plus UPS. No party walls.
(7)
Disintegrator Room
C/S
9.0
Locate near to but outside of B(1).
(8)
Emergency
Power
S
5.5
Locate near to B(5). Provide ventilation.
Unit
(9)
TSD Workshop and
18.5
Store
(10)
Equipment store (TSD)
C/S
12.0
Provide workbench, adequate power points and ventilation. Access via B(1). Floor loading
160 kg/m2.
Locate as close as possible to the volumetric centre of the confidential and secure zones: ideally interconnect with B(9) or A(10).
REG II
(12)
General Office
2
DS10
(13)
Strong Room
(14)
Office
1
DS6
(15)
Office
1/2
DS5
(16)
Office
1/2
DS7/5
(17)
Secretaries
4
$1/2
(18)
Dark room
(18)(a)
Store
(19)
Equipment Store
(19.1) Safe Speech Room
S
0)
S
0
0
23.0
14.0
18.5
18.5
18.5
32.5
24 hr A/C required.
No external walls: Sole access via B(12). Construction specs as B(4).
Locate adjacent to B(12) With view of entrance to suite
Provide sink. Locate adjacent to B16.
11.0
9.0
Access via B16.
9.0
||
11
30.0
Floor
Minimum dimensions 6 x 5 x 3.25 m high. Loading 300kg per m2. No party wall Except with Sections A & B. Locate just off entrance to suite 12/19.1.
REG III
(20) Office
1
DS7/8
S
12.0
24 hr A/C required.
Access via B(1).
(21)
Store
9.0
Access via B(20).