Yantian Port
6
11.
The delegation was met and briefed by the Chairman of the Shenzhen
Dongpeng Industry Co. Ltd. which was responsible for development of this port.
12.
This port has a planned wharfline of 16.4 km with 48 deep water berths
including 9 container berths, 6 coal berths, 23 bulk and general cargo berths and 10
berths for other purposes. By the year 2000, the estimated cargo throughput is 42.7
million tons and will reach 76 million tons by 2020.
13.
At present, the port has completed one berth for 15,000 ton-class ships,
one berth for 3,000 ton-class and three berths for 1,000 ton-class. By the end of
1992, two berths of 50,000 ton-class ships with 350 meters of wharfline will be
completed. A total investment of RMB 500 million has been made to provide the
existing five berths and some 60 ha. of back-up land (see plan at Appendix 5, 6).
14.
A dedicated freight rail to connect the port with the national railway
network is under construction.
No comments yet.
Private notes are available after approval.