Airport
Brief Scope of Consultancy
NEW AIRPORT AND RELATED PROJECTS LIST OF CONSULTANCIES UNDER WAY
· 1 August 1992
Commencement Date/ Main Consultants
Managing Department (Officer In-Charge)
Nationality (Origin) of Consultant HK(UK)/ JUK/
Agreement Agreement No./ Completion
Funding
Date
Type/ Current Est.
Source/
PWP No.
Fees ($M) (MOD)
March
1994
101
PAA
HK(UK)
IDC $546M
1. Passenger Terminal Complex Detailed Design Consultancy - prepare detailed architectural and engineering design work required for the passenger terminal at the new airport
2. New Airport Traffic Study
12 March 1992
The Mott Consortium (Joint Venture of Mott Connell Ltd./ BAA plc / Foster HK Ltd.)
Provisional Airport Authority (Mr Peter Wright - 824 7388)
3. SPC Design
1 July 1992
Provisional Airport Authority
HK(USA)
Wilbur Smith Associates
1 July 1992
Provisional Airport Authority
St. Cleer/
HK/ Netherlands/
Australia/
HK(UK)
Civil Engineering
1. Central and Wanchai Reclamation -
investigation and design of reclamation with the first phase to form land for the airport railway.
2. West Kowloon Reclamation -
investigation, design,construction and supervision of reclamation and infrastructure to provide land for PADS transport reserves and urban development
ARM Verbeek/
MRT/
Ove Arup
|4 June 1990(on time
charge) Maunsell Consultants Asia Ltd.
190
PAA
105
PAA
$12M
Territory Development Department
|HK(UK)
mid 1992
|(Mr K Austin - 882 7190)
CE 10/90
IDC $64.3M
262CL &
353CL
July 1990
Territory Development
|HK(UK)
1999
CE 12/90
354CL
Mott MacDonald Hong Kong Ltd.
Department
IDC
|(Mr K Austin - 882 7190)
$165.55M