Airport

Brief Scope of Consultancy

NEW AIRPORT AND RELATED PROJECTS LIST OF CONSULTANCIES UNDER WAY

· 1 August 1992

Commencement Date/ Main Consultants

Managing Department (Officer In-Charge)

Nationality (Origin) of Consultant HK(UK)/ JUK/

Agreement Agreement No./ Completion

Funding

Date

Type/ Current Est.

Source/

PWP No.

Fees ($M) (MOD)

March

1994

101

PAA

HK(UK)

IDC $546M

1. Passenger Terminal Complex Detailed Design Consultancy - prepare detailed architectural and engineering design work required for the passenger terminal at the new airport

2. New Airport Traffic Study

12 March 1992

The Mott Consortium (Joint Venture of Mott Connell Ltd./ BAA plc / Foster HK Ltd.)

Provisional Airport Authority (Mr Peter Wright - 824 7388)

3. SPC Design

1 July 1992

Provisional Airport Authority

HK(USA)

Wilbur Smith Associates

1 July 1992

Provisional Airport Authority

St. Cleer/

HK/ Netherlands/

Australia/

HK(UK)

Civil Engineering

1. Central and Wanchai Reclamation -

investigation and design of reclamation with the first phase to form land for the airport railway.

2. West Kowloon Reclamation -

investigation, design,construction and supervision of reclamation and infrastructure to provide land for PADS transport reserves and urban development

ARM Verbeek/

MRT/

Ove Arup

|4 June 1990(on time

charge) Maunsell Consultants Asia Ltd.

190

PAA

105

PAA

$12M

Territory Development Department

|HK(UK)

mid 1992

|(Mr K Austin - 882 7190)

CE 10/90

IDC $64.3M

262CL &

353CL

July 1990

Territory Development

|HK(UK)

1999

CE 12/90

354CL

Mott MacDonald Hong Kong Ltd.

Department

IDC

|(Mr K Austin - 882 7190)

$165.55M