List of Consultancies for New Airport and Related Projects

| CHEK LAP KOK AIRPORT

Brief Scope of Consultancy

1. Airport Master Plan Study - air traffic

forecasts, layout for the Chek Lap Kok airport, civil engineering design and environmental impact assessment.

as at 1 Septembe992

Commencement Date/ Main Consultants

14 July 1990

Greiner-Maunsell J.V.

Managing Department (Officer In-Charge)

Provisional Airport Authority (Mr F Uiterwijk - 824 7333)

Nationality | Agreement

(Origin) Completion

of

Date Consultant

USA/ |HK(UK)

Agreement No./

Type/ Fees ($M)

Funding Source/

PWP No.

29 February

PAA 01/90

IDC

PAA

$ 256 M

1992 (Substantial Completion) Final reports

on minor

studies submitted in August 1992.

PAA 03/90 Management

2. Chek Lap Kok - management assistance

to PAA.

10 September 1990 International Bechtel Incorporated

3. Passenger Terminal Complex Detailed Design Consultancy - prepare detailed architectural and engineering design work required for the passenger terminal at the new airport

4. Site Preparation Contract Design

12 March 1992

The Mott Consortium⚫ |(Joint Venture of Mott

Connell Ltd./ BAA plc / Foster HK Ltd.)

1 July 1992 Greiner-Maunsell J.V.

3 August 1992 Wilbur Smith Associates

5. New Airport Traffic Study

6. Airport at Chek Lap Kok - To consult on

documentation, tendency, procurement, selection & installation of Air Traffic Control Equipment to support the new airport.

7. Airport at Chek Lap Kok -

To consult on documentation, tendency, procurement, selection & installation of Specialist Mechanization Equipment for the proposed Air Mail Centre.

November 1992

Provisional Airport Authority (Mr K Owen - 802 3565)

USA

9 September 1991 (terminated on 30 July 1991)

PAA

$19.4M

HK(UK)/ UK/ HK(UK)

March

101

PAA

1994

IDC

$ 536 M

Provisional Airport Authority (Mr Peter Wright - 824 7388)

Provisional Airport Authority [(Mr David Corby - 824 7337)

Provisional Airport Authority (Mr David Corby - 824 7337)

Civil Aviation Department (Mr Peter Bodiley - 867 4250)

USA/ HK(UK)

HK(USA)

105

PAA

DC

$12M

190

PAA

To be determined

To be determined

To be

determined

December 1992

Post Master General (Mr Kingsley Li - 847 1266)

To be determined

To be determined

To be

determined

Page

Comments

Approved members can add comments, bookmarks, and private notes.

No comments yet.

Private Research Note

Private notes are available after approval.