List of Consultancies for New Airport and Related Projects
| CHEK LAP KOK AIRPORT
Brief Scope of Consultancy
1. Airport Master Plan Study - air traffic
forecasts, layout for the Chek Lap Kok airport, civil engineering design and environmental impact assessment.
as at 1 Septembe992
Commencement Date/ Main Consultants
14 July 1990
Greiner-Maunsell J.V.
Managing Department (Officer In-Charge)
Provisional Airport Authority (Mr F Uiterwijk - 824 7333)
Nationality | Agreement
(Origin) Completion
of
Date Consultant
USA/ |HK(UK)
Agreement No./
Type/ Fees ($M)
Funding Source/
PWP No.
29 February
PAA 01/90
IDC
PAA
$ 256 M
1992 (Substantial Completion) Final reports
on minor
studies submitted in August 1992.
PAA 03/90 Management
2. Chek Lap Kok - management assistance
to PAA.
10 September 1990 International Bechtel Incorporated
3. Passenger Terminal Complex Detailed Design Consultancy - prepare detailed architectural and engineering design work required for the passenger terminal at the new airport
4. Site Preparation Contract Design
12 March 1992
The Mott Consortium⚫ |(Joint Venture of Mott
Connell Ltd./ BAA plc / Foster HK Ltd.)
1 July 1992 Greiner-Maunsell J.V.
3 August 1992 Wilbur Smith Associates
5. New Airport Traffic Study
6. Airport at Chek Lap Kok - To consult on
documentation, tendency, procurement, selection & installation of Air Traffic Control Equipment to support the new airport.
7. Airport at Chek Lap Kok -
To consult on documentation, tendency, procurement, selection & installation of Specialist Mechanization Equipment for the proposed Air Mail Centre.
November 1992
Provisional Airport Authority (Mr K Owen - 802 3565)
USA
9 September 1991 (terminated on 30 July 1991)
PAA
$19.4M
HK(UK)/ UK/ HK(UK)
March
101
PAA
1994
IDC
$ 536 M
Provisional Airport Authority (Mr Peter Wright - 824 7388)
Provisional Airport Authority [(Mr David Corby - 824 7337)
Provisional Airport Authority (Mr David Corby - 824 7337)
Civil Aviation Department (Mr Peter Bodiley - 867 4250)
USA/ HK(UK)
HK(USA)
105
PAA
DC
$12M
190
PAA
To be determined
To be determined
To be
determined
December 1992
Post Master General (Mr Kingsley Li - 847 1266)
To be determined
To be determined
To be
determined
Page