5. Reprovisioning of Cheung Sha Wan
Shipyards in Siu Lam (To plan and prepare preliminary design for a preferred scheme for the proposed shipyards at Tai Lam Kok, Siu Lam for reprovisioning of Cheung Sha Wan Shipyards in the Preliminary Report Stage).
6. South-east Tsing Yi Port Development -
Planning and Engineering Feasibility Study (to determine the best configuration and development option for port development at South-east Tsing Yi and to proceed with preliminary design of the recommended option to enable the preparation of gazette plans and lease conditions).
6 June 1990
Territory Development
HK(UK)
Department/Tuen Mun
November
1990
CE/11/73
IDC
354CL
Scott Wilson Kirkpatrick & Partners
Development Office
|(Mr W C Chan - 451 3237)
$4.5M (Preliminary Report Stage + Investigation)
25 June 1990
|Maunsell-Scott Wilson
Joint Consultants
Territory Development
Department/Tsuen Wan
Development Office
(Mr B H Coultous - 402 1504)
HK(UK)
13 September
1991
CE 3/90
FS
$12.56M