5. Reprovisioning of Cheung Sha Wan

Shipyards in Siu Lam (To plan and prepare preliminary design for a preferred scheme for the proposed shipyards at Tai Lam Kok, Siu Lam for reprovisioning of Cheung Sha Wan Shipyards in the Preliminary Report Stage).

6. South-east Tsing Yi Port Development -

Planning and Engineering Feasibility Study (to determine the best configuration and development option for port development at South-east Tsing Yi and to proceed with preliminary design of the recommended option to enable the preparation of gazette plans and lease conditions).

6 June 1990

Territory Development

HK(UK)

Department/Tuen Mun

November

1990

CE/11/73

IDC

354CL

Scott Wilson Kirkpatrick & Partners

Development Office

|(Mr W C Chan - 451 3237)

$4.5M (Preliminary Report Stage + Investigation)

25 June 1990

|Maunsell-Scott Wilson

Joint Consultants

Territory Development

Department/Tsuen Wan

Development Office

(Mr B H Coultous - 402 1504)

HK(UK)

13 September

1991

CE 3/90

FS

$12.56M

350CL

Share This Page