Notice of Prequalification
May 1992
Highways Department
HY/91/18
$5290M
476TH
to
(Mr K H Lee - 721 4307)
gazetted on 16.11.90
May 1997
Highways
1. Lantau Fixed Crossing - Tsing Ma Bridge
(Contract No. HY/91/18) - a 2167 metre long suspension bridge with a central span of 1 377 metres carrying road and rail traffic from Tsing Yi to Ma Wan.
2. Lantau Fixed Crossing - Kap Shui Mun
Bridge and Ma Wan Viaduct (Contract No. HY/91/19) - a bridge of 671 metres including side spans carrying road and rail traffic from Ma Wan to North Lantau. To be constructed on a design and build basis. The viaduct will link this bridge to the Tsing Ma bridge.
3. North Lantau Expressway, Tai Ho Section
(Contract No. HY/91/07) - construction of about 6.6 km of a dual three-lane highway on north Lantau, including site formation for the twin-track airport railway and utility reserve.(incl. watermains)
4. Lantau Fixed Crossing - advance
earthworks for Route 3 Interchange, Contract 3A (Contract No. HY/91/21)
Tenders invited on 31 July 1991 (returned on
16 December 1991)
Notice of Prequalification gazetted on 16.11.90. Tenders were invited on 5 November 1991 (to be returned on 5 June 1992)
Notice of Prequalification gazetted on 9.8.91 Tenders were invited on 14 December 1991 (to be returned on 20 March 1992)
Notice of
Prequalification invited on
13 September 1991 Tenders invited on 15 January 1992
(to be returned on
13 March 1992)
October 1992
to
Highways Department
HY/91/19
$2050M
476TH
(Mr K H Lee - 721 4307)
April 1997
May 1992
to August 1996
Highways Department (Mr S C H Wan - 721 6540)
HY/91/07
$1859M
491TH
April 1992
Highways Department
HY/91/21
$770M
492TH
to
(Mr K H Lee - 802 1333)
May 1994