TNAG-2410-FCO40-3504-Hong-Kong-Port-and-Airport-Development-Strategy-(PADS)-Brit-1992 — Page 22

FCO40 Hong Kong Department Records 聯邦事務部香港部檔案 All

CONSULTANTS:

SCOPE OF CONSULTANCY

Highways:

-

Traffic

1. WESTERN HARBOUR CROSSING

Feasibility Study forecast and investigation, alignment and layout of crossing West Kowloon and Western District.

2. AIRPORT RAILWAY FEASIBILITY

STUDY

Investigation of alignment, station locations and operation of airport railway, and traffic forecast.

3. LANTAU FIXED CROSSING

Preliminary design and preparation of bid package.

4. ROUTE 3 TSING YI SECTOR

BETWEEN LAI CHI KOK & TING KAU

Design of advance works.

5. ROUTE 3 TSING YI SECTOR

Detailed design, preparation of contract and supervision of construction.

6. NORTH LANTAU EXPRESSWAY

Detailed design of highway.

7. LANTAU FIXED CROSSING

Design of Tsing Ma Suspension Bridge.

8. LANTAU FIXED CROSSING

Independent design check of Tsing Ma Suspension bridge.

9. WEST KOWLOON EXPRESSWAY

Investigation, design and construction supervision.

10. LANTAU FIXED LINK

Project Management.

COMMENCEMENT DATE/MAIN CONSULTANTS

November 1989 Acer Consults. (Far East) Ltd and Maunsell Consults. Asia Ltd Joint Venture

March 1990

Acer Consults. (Far East) Ltd and Maunsell Consults. Asia Ltd Joint Venture

April 1990 Mott MacDonald HK Ltd

June 1990 Scott wilson Kirkpatrick and Partners

September 1991 Scott Wilson Kirkpatrick and Partners

July 1990 Mott MacDonald

September 1990 Mott MacDonald HK Ltd

September 1990 Flint & Neill Partnership

September 1990 Freeman Fox Maunsell

May 1992 Sir William

Halorow

MORRELL.04

Comments

Approved members can add comments, bookmarks, and private notes.

No comments yet.

Private Research Note

Private notes are available after approval.