CONSULTANTS:
SCOPE OF CONSULTANCY
Highways:
-
Traffic
1. WESTERN HARBOUR CROSSING
Feasibility Study forecast and investigation, alignment and layout of crossing West Kowloon and Western District.
2. AIRPORT RAILWAY FEASIBILITY
STUDY
Investigation of alignment, station locations and operation of airport railway, and traffic forecast.
3. LANTAU FIXED CROSSING
Preliminary design and preparation of bid package.
4. ROUTE 3 TSING YI SECTOR
BETWEEN LAI CHI KOK & TING KAU
Design of advance works.
5. ROUTE 3 TSING YI SECTOR
Detailed design, preparation of contract and supervision of construction.
6. NORTH LANTAU EXPRESSWAY
Detailed design of highway.
7. LANTAU FIXED CROSSING
Design of Tsing Ma Suspension Bridge.
8. LANTAU FIXED CROSSING
Independent design check of Tsing Ma Suspension bridge.
9. WEST KOWLOON EXPRESSWAY
Investigation, design and construction supervision.
10. LANTAU FIXED LINK
Project Management.
COMMENCEMENT DATE/MAIN CONSULTANTS
November 1989 Acer Consults. (Far East) Ltd and Maunsell Consults. Asia Ltd Joint Venture
March 1990
Acer Consults. (Far East) Ltd and Maunsell Consults. Asia Ltd Joint Venture
April 1990 Mott MacDonald HK Ltd
June 1990 Scott wilson Kirkpatrick and Partners
September 1991 Scott Wilson Kirkpatrick and Partners
July 1990 Mott MacDonald
September 1990 Mott MacDonald HK Ltd
September 1990 Flint & Neill Partnership
September 1990 Freeman Fox Maunsell
May 1992 Sir William
Halorow