It is proposed that the new airport will be- come a separate police district with its own police station. Walking and motorized police patrols we be maintained to provide a strong detergent presence throughout the airport.
Airport Development Phasing
Development plans have been scheduled to a timeframe according to the current demand forecasts. However, actual demand increases or decreases may either accelerate or slov down implementation of each phase or sub-phase.
A phased implementation programme has
been developed in incremental construc- tion stages to ensure the timely availability
of additional capacity required to meet future growth-driven needs.
Airport Opening, 1997
Construction of the opening phase development of the new airport will be sub- stantially completed by the end of 1996. with airport opening scheduled for mid 1997.
The opening phase includes the entire air- por reclamation. infrastructure for all fu- ture phases, and facilities to meet the projected 2002 demand of 35 million an- nual passengers using 60 aircraft gates. These facilities include the southem run-
way and related taxiway system: the ter minal complex comprising Terminals 1 and 2, including an attached concourse with 42 frontal and 18 remote gates; an under-
ground automated people mover system; rail/road/ferry surface access systems; a complete air traffic control system, and sup- port and ancillary facilities.
The current programme indicates that the northern runway will be provided approxi- mately two years after airport opening.
Phase I, To Year 2010
By the end of Phase I in the year 2010. it is expected that additional facilities will have been provided by adding the second runway and associated taxiway system, a second crossfield taxiway, isolation pad, and addi- tional rapid runway exit taxiways for the first
runway.
Expansion of the processing terminal and concourse will meet the projected 2010
Legend
Airport Opening, 1997
Phase I, To Year 2010
Phase I, To Year 2040
Airport Development Phasing
20
20
(Commer
Compfercial
Open
Space
Resepre
M
| Commercial,
300
GOO
900 m