TNAG-2344-FCO40-3410-Future-of-Hong-Kong-British-Consulate-General-1992 — Page 157

FCO40 Hong Kong Department Records 聯邦事務部香港部檔案 All

CONFIDENTIAL

MANAGEMENT IN CONFIDENCE

163)

P=

НКС 406,

ستار

M

Morn's

2 NOV 199

I for drief for End C. Ming

He PTC, pf. Kory

2.

Does a condrration store in early

From:

Date:

?3 mean there's no problem abol WC not giving us accase bo le file until Dec 92

CC:

M HR Bertram, OED

15 November 1991

PS/PUS

Chief Clerk o.r. Sir John Coles Miss Spencer Heads:

MVD

NTCD

Consular Dept Security Dept

TSD

News Dept

Mr

We Biseks

1. Noted.

design-brief

2. - Yes. The design brief timetable means that we would not want access to the site before early 1993 (except for test-boring for the Geotechnical

survey,

and HKG

RMD

HKD

FED

ISD(S)

ISD (0)

Information Dept

CRD

Joint Directorate

PUSD

Mr Heap, BTC, Hong Kong Mr Pugh, British Council

Lands birth have agreed that we can enter the site for that panglaise during 192 whenever we need to).

Mrs Sutherland

Mr Burns

PS/Lord Caithness

M 10/0

HONG KONG: BRITISH CONSULATE GENERAL

Problem

1. The project team has now visited Hong Kong to explore the way forward. What should the next steps be?

Recommendation

2.

a)

b)

c)

I recommend that:

Lord Caithness should be prepared to intercede with the Governor to ensure that the terms of the Private Treaty Grant take sufficient account of HMG's longer term interests;

we should proceed with colocation of the British Council;

we should appoint Swire Properties as our executive Project Managers in Hong Kong;

CONFIDENTIAL.

MANAGEMENT IN CONFIDENCE