standing' for a new Hong Kong airport, signed on Tuesday by Prime Minister John Major and Chinese premier Li Peng, frees the way for construction of 10 linked projects totalling HK$97 000M (57461M) The mino randum guarantees that China will not interfere in any way with the construction or operation of these projects known collectively as the Airport Core Programme.

It also sets out guidelines on consultation needed between the Hong Kong government and China before possible future associated projects can start after Hong Kong censes to be a British colony in July 1997.

These are the 10 projects in the airport programme:

CHEK LAP KOK AIRPORT

Cost: HK$43 600M ($3354M). Finance: 39% HK government, 61% private sector for services, cargo, catering etc.

Description: Two runways built on 1276ha of partially reclaimed site. Terminal and handling for 80M passengers/year and 33Mt cargo. First phase includes one runway and facilities for 33M passengers/year. Tenders Invited November 1991 for main 90M m3 reclamation and site preparation contract Value IIK$7000M (5538M) Late 1993 for infrastructure contracts.

Construction period: Preliminary

J

Chek Lap Kok

airport

19-in id-d

A

auto andme} {..

Tung Chung development

LANTAU

ISLAND

North Lantau Expreszway

--Expressways

Airport railway

Railway

Route J

Lantau hied crossing

Tong Yi

Jest Kowloon

karmatkan

funne is

Raclacivati

Wen Kowloon Expressway

Existing au port

KOWLOON,

}.

Airport rahway

Westem

POWERS 24

harbour

Crossing

Central and

Wanche

reclamation

'KING KONG ISLAND

burg

સમય

HONG KONG CONTRACTS

30ha reclamation contract already under way. Value 11K$400M (531M). Contractor Kumagai(HK)-HAM- Maeda JV

Main site preparation contract, early 1992 – mid 1904.

Infrastructure contracts, early 1994 - 1st phase completion mid 1997. Consultant: Greiner Maunsell (Asia) JV.

TUNG CHUNG DEVELOPMENT Cost: First phase IIK$2600M ($200M).

Finance: HK government Description Enlargement of fishing village to 20 000 inhabitant town. Ifousing, recreational, shopping. commercial facilities Sewage treat- ment works and refuse transfer ⚫tation.

Tenders invited October 1991 for Isha reclamation contract.

Jale 1991 for main infrastructure

Contracts

Construction period First phase early 1992 - mid 1997 Consultant. Mott MacDonald (HK)

NORTH LANTAU EXPRESSWAY Cost: HK$4300M (£331M). Finance: HK government. Description: Dual three lane 13 6km expressway with four grado sepa- rated interchanges. Connects sirport with Lantau fixed crossing Tenders invitad: November 1991 for 6km first phase.

Construction period. Early 1992 mid 1996

Consultant: Mott MacDonald (HK).

-

LANTAU FIXED CROSSING Cost. HK$12 100M (5931M). Finance IIK government, plans to recoup cost from private sector by selling operation franchise for tolled crussing

Description: (verall Ikm crussing including two bridges and viaduct between Lantau and Tsing Yi islands. Tsing Ma suspension bridge: 2km long with 1377m main span. Kap Shul Mun bridge: three span. 691m long with 440m main span. Viaduct over Ma Wan island. Struc- tures are all two level with six lane

expressway over twin track railway. Tenders invited. July 1991 for Taing Ma bridge. Approx value HK$5000M ($385M). October 1991 for Kap Shul Mun bridge. Offered as design & build contract.

-

Construction period, spring 1992 - early 1997.

Consultant: Mott MacDonald (HK). Prequalifying tenderers for Tsing his bridge:

Anglo Japanese Construction, led by Trafalgar House

2 Nippon Steel Corporation

3 Hyundai Engineering & Construction

4 Western Harbour StrategIC Development Company led by JIK contractor Hopewell

5 ilong Kong International Consortium led by HK contractor Shut-On.

For Kap Shui Mun bridge as above plus 6 Kumagai Maeda-Yokogawa- Hitachi JV

ROUTE THREE HIGHWAY Cost lik$5 600M (543]M)

Finance: HK government. Description: Dual three and four lane 7.3km highway linking Lantau fixed croming with West Kowloon expressway. Includes 1.6km twin bored tunnels on Tsing Yi laland and 500m bridge linking Tsing Yi with Kowloon mainland.

Tenders invited November 1991 for bulk earthworks contract. Early 1902 for main road contract. Construction period. Early 1992

mid 1996

Consultant: Scott Wilson Kirkpa trick, Parsons Brinkerhoff. Charles Haswell, and Wilbur Smith in JV

WEST KOWLOON

RECLAMATION

Cost: HK$9000M ($682M) Finance HK government. Description Reclamation of 330ha along Kowloon western waterfront between Yau Ma Tes and Lai Chi Kok. Includes 8kin seawall Forms transport corridor for Route 3. West Kowloon expressway and airport railway Provides land for 18 relo

*

ค่า

cated shipyards, factories, pier developments.

Tenders invited: August 1991 for drainage works.

Late 1991 for reclamation contracts Construction period: mid 1991-1996 Two reclamation contracts under way: Contractor Kumagai Maeda JV and Boskalis

Consultant: Mott MacDonald HK

WEST KOWLOON EXPRESSWAY

Cost: HK$1700M (£131M) Finance HK government. Description Dual three and four lane 3 0km expressway linking Route 3 with Western harbour crussing. Tenders invited. late 1992. Construction period early 1993 1996

Consultant Freeman Fux HK and Maunsell Consultants (Asia) in JV

WESTERN HARBOUR CROSSING

Cost. HK$390M (5300M) Finance 100% private sector Description 1.4km immersed tube tunnel carrying six lane West Kow- loon expressway under Victoria Har bour Formed of four 1300m long prefabricated tunnel units Offered

as buikd-operate transter contract Tenders invited Early 1:192 for ROT

Contract

İLE

انادا

#

Pervikti

TUON'S

*

airport

Contracts

Construction period 1882 1907 Consultants: Acer, Maunsell (Asia), Parsons Brinkerhoff, Howard Humphrey, MVA

AIRPORT RAILWAY Cost HK$12 500M (5962M) Finance: HK government through operator Mass Transit Railway Corporation.

Description 32km high speed and domestic link between airport, kow- loon and Hong Kong Island. Runs largely a grade following route of now expressways includes six stă- tions, three bored tunnels totalling 35km and immersed tube crossing beneath Victoria harbour.

Tenders invited. Yet to be decided Construction period: 1992 – 1997. Consultant. Feasibility study by MTRC

CENTRAL & WANCHAI RECLAMATION

Cost. HK$1800M (5138M) Finance ilk government Description 20ha reclamation of Hong Kong Island providing land for airport railway terminus and linked Cons- commercial developments truction of 1 lkin seawail and ferry piers.

Tenders invited November 1997 Construction period Early 1992 1994

Consultant Maunsell a Asta)

t:་ .xte Civ

8.5.

1987 Atsu

OF

execi

Comments

Approved members can add comments, bookmarks, and private notes.

No comments yet.

Private Research Note

Private notes are available after approval.