TNAG-2259-FCO40-3255-Hong-Kong-Port-and-Airport-Development-Strategy-(PADS)-Brit-1991 — Page 197

FCO40 Hong Kong Department Records 聯邦事務部香港部檔案 All

1.

New Airport Contracts: British Participation

Of the 21

awarded to

consultancies let SO

British

firms

14 have been

far,

or their Hong Kong

affiliates, a further four to consortia with British partners. (Two were awarded to US firms, and three to consortia with a US partners.)

2.

of the four major

engineering

contracts awarded so

3.

far, one was to a Hong Kong firm with 50% British interests, namely the West Kowloon reclamation, Phase I Contract awarded to Gammon Construction Ltd. (None

of the contracts went to US firms.)

Of the four prequalified tenderers for the Tsing Ma Bridge Contract, one is a UK/Japanese consortium. (One of the competing consortia includes a small US

there is no other US involvement.)

element

-

4.

5.

Of the six consortia on the shortlist for the airport site preparation contract, three include British firms

(three include US firms).

Although the US firm Bechtel has the overall programme management consultancy, it has no influence over the selection of consultants and contractors. The design work for the two largest elements of the project have

been undertaken by :-

(a)

Greiner-Maunsell,

a

consortium, who are

US,

and British

Hong Kong doing the civil engineering

design work for the airport; and

(b) Mott MacDonald HK, a Hong

Kong company

with

British affiliations, who are doing the design

work for the Tsing Ma Bridge.