Route 3 Interchange advance earthwork - detaile May 1991 design

Highways Department

2002AX

|(Mr C K Wong - 702 6792)

D or IDC

$21M

5.

Route 3 - Tsing Yi Section - Design Stage II

May 1991

Highways Department

4.92

339TH

|(Mr C K Wong - 702 6792)

6.

Route 3 - Kwai Chung Section - Design Stage II

May 1991

Highways Department

4.92

339TH

(Mr CK Wong - 702 6792)

7.

Central Kowloon Route Feasibility

Study

July 1991

Highways Department

12.92

CE 58/90

6008TX

(Mr J M Turner - 573 3885)

FS

$20M

18.

Route 16 Feasibility Study

June 1991 (earliest)

Highways Department

|(Mr C K Wong - 702 6792)

19.

Lantau Fixed Crossing - Lantau

Approach Road including Toll Plaza

(may include Toll Collection System)

October 1991

Highways Department

(Mr K S Leung - 721 6540)

10.97

N/A

D

2002AX &

476TH

$20M

Water

Supplies

1.

XXXX 2.

xx 3.

Water transfer, treatment and supply to

North Lantau - Consultants' fees and

investigations for Stage I works

Future increase of water supply from

China Stage III remaining works

(to be combined with the above consultancy)

North Lantau Water Supply - Stage I

(to be combined with the above consultancy)

Management 1.

Airport and Related Projects Overall

Works Management - Phase II

March 1991 shortlisting

30 June 1991 award

Water Supplies Department |(Mr C H Ng - 829 4408)

6.96

-

2005AX

December 1990 shortlisting

|30 June 1991 award

Water Supplies Department

(Mr C H Ng - 829 4408)

6.95

2005AX

April 1991 shortlisting

Water Supplies Department

6.96

2005AX

30 June 1991 award

(Mr C H Ng - 829 4408)

January 1992

Works Branch

(Mr A Fung - 829 6780)

70AA