TNAG-2251-FCO40-3235-Hong-Kong-Port-and-Airport-Development-Strategy-(PADS)-fina-1991 — Page 219

FCO40 Hong Kong Department Records 聯邦事務部香港部檔案 All

NEW AIRPORT AND RELATED PROJECTS

LIST OF CONSULTANCIES TO COMMENCE IN THE NEXT TWELVE MONTHS

Brief Scope of Consultancy

3 March 1991

Expected

Commencement Date

Managing Department

(Officer In-Charge)

Nationality

(Origin)

Agreement Agreement No./ Funding

Completion | Typo/Feos($M)

Source

Dake

PWP No

Airport

1.

Chek Lap Kok Airport –

25 March 1991

In-town check-in implementation study

(possibly to be combined with the Airport Master Plan Study)

|Civil Aviation Department/

|(Mr P K N Lok – 867 4201)

Civil

Engineering

1.

Replacement Airport at Chek Lap Kok

10 March 1991

: Investigation – Structural geology study for

PADS

a study on the Seismotectonica

and crustal structures pertinent to Hong Kong

Civil Engineering Services

Department (Mr M S Leung -

368 9768)

Highways 1.

Lantau Fixed Crossing -

Traffic Control & Surveillance

6.91

S

FS

10 Oct 91 CE 29/82(ext) |2016AA

$IM

25 March 1991

Highways Department

10.97

(subject to PWSC approval) (Mr K S Leung - 721 6540)

D

$20M

2002AX &

476TH

2.

Lantau Fixed Crossing –

March 1991

Highways Department

5.91

2002AX

Environmental Assessment Study

(approval obtained on 27.2.91(Mr K S Leung – 721 6540)

I

$2M

3.

Green Island Link Preliminary Feasibility

Study -

April 1991

Highways Department

2.92

CE 21/90

462TH

(Mr J M Turner - 573 3885)

FS

Feasibility study of a dual 3 lane/ 2 lane highway connecting west of Hong Kong

$11M

Environmental Protection

Island to north of Lantau, via Kau Yi

Chau, environmental assessment

included.

Department - EA/EIA studies

only (Mr W J Farrell

835 1102)

Comments

Approved members can add comments, bookmarks, and private notes.

No comments yet.

Private Research Note

Private notes are available after approval.