Central and Wanchai Reclamation – Phase I reclamation of about 40 ha and construction of around 1.110 metres of sea wall between Rumsey Street and Tamar to provido land for the expansion of the Central Business Area and the Airport Railway Términus as well as construction of replacement ferry piers and air conditioning intake facilities.
April 1991
Territory Development Department
(Mr K Austin-848 2668)
üighways
1. Route 3 Sector between Kwai Chung and Lai Chi Kok - construction of approx. 4 km of a duri 4-lano highways on elevated stretures,
May 1991
Highways Department
(Mr H S Kwong – 733 2508)!{
rojecte
2. North Lantau Expressway, Tai Ho Section-
construction of about 6 km of a dual three-lane highways on north Lantau, including site formation for the twin-track airport railway.
3. North Lantau Expressway, Yam O Section -
construction of about 4 km of a dual three-lano highways on north Lantau, including site formation for the twin-track airport railway,
-
divatization 1. Rowe 3 Sector between Kwai Chung and Ting
Kau possible bid package for financing, designing, constructing and operation of about 6 km of dusi-three lans roads on a cable stayed. high level bridge, elevated structures, bored tunnels, and a medium level bridge.
་
August 1991
|November 1991
March 1991
(April 1991
2. Western Harbour Crossing - bid package for
financing, designing, constructing and operation of a 1.5 km tunnel crossing of the Victoria Harbour batwees West Kowloon and Sai Ying Pun. The tunnel may rccommodate a dual three-lane The tunnei may accommodate a dual three-lane road and possibly also a twin-track railway.
Highways Department
(Mr K S Leung – 721 6540)
Highways Department
(Mr KS Leung - 721 6540)
Highways Department
|(Mr H S Kwong – 733 2308)|
Highways Department
(Mr J M Turner - 573 3885)
ર
1.
Rowe 3 - sito investigation for road aiigment.
September 1990
vestigation
(CRAI route) between Ting Kau and Sham Shui Po.
2. North Lantau Expressway – sito investigation for September 1990
new alignment.
3. Central and Wanchai Reclamation - Phase I – site October 1990
investigation for Phase I reclamation and maraino borrow RTER.
-
4. Route 3 site investigation for highways
between Tai Lam Country Park and Au Tau.
February 1991
Highways Department
(Mr H S Kwong – 733 2508)|
Highways Department (Mr KS Leung- 721 6540)
Territory Development Department
(Mr K Austin – 843 2668)
Highways Department
(Mr H S Kwong-733 2508)