roi project comprises two major
viaduct across Ma Wan in interchange with Route on
plaza and approach roads on North Lantau and a
control and survelliance system which extends
limits into the adjoining road networks.
is proposed that these works De packaged into fave contracts as follows
It
a
Contact
A Lump sum
Consultants
ponents.
flequa
the
constr ition" contract. Government's to complete the detailed design of
eign outstanding ancillary
эг
C Lion and "enders to be invited in November 200 and February 1991 respectively.
ay Chur Mun Bridge ŷ ya wan Viaduct
A Lump sum fim price design anių jutili Contract.
Tenderers to submit with their tenders a preliminary design of the bridge and the viaduct. The detailed lesign of these structures to be developed by the successful tenderer's designer for approval by
Government.
Cyud
ό,τι
ana tenders will be invited 10 November 1990 and February 1991 respectively.
Jon
Route 3 Interchange
LOUIS LEUCtion contract Detalled design to pe carried out by consultants as part of the Route 3 project.
Piequa lication and render invitations scheduled for May 1991 and December 1991 respectively.
(2)
Contract
Cantau Approach Road & oil Plaza
A cons
Prequalification and tender invitations to suit the programme for the North Lantau Expressway.
!