Lanted

T

Fossing

bridges Tsing Yi.

comprehelle i

beyond he

roi project comprises two major

viaduct across Ma Wan in interchange with Route on

plaza and approach roads on North Lantau and a

control and survelliance system which extends

limits into the adjoining road networks.

is proposed that these works De packaged into fave contracts as follows

It

a

Contact

A Lump sum

Consultants

ponents.

flequa

the

constr ition" contract. Government's to complete the detailed design of

eign outstanding ancillary

эг

C Lion and "enders to be invited in November 200 and February 1991 respectively.

ay Chur Mun Bridge ŷ ya wan Viaduct

A Lump sum fim price design anių jutili Contract.

Tenderers to submit with their tenders a preliminary design of the bridge and the viaduct. The detailed lesign of these structures to be developed by the successful tenderer's designer for approval by

Government.

Cyud

ό,τι

ana tenders will be invited 10 November 1990 and February 1991 respectively.

Jon

Route 3 Interchange

LOUIS LEUCtion contract Detalled design to pe carried out by consultants as part of the Route 3 project.

Piequa lication and render invitations scheduled for May 1991 and December 1991 respectively.

(2)

Contract

Cantau Approach Road & oil Plaza

A cons

Prequalification and tender invitations to suit the programme for the North Lantau Expressway.

!

Share This Page