TNAG-2143-FCO40-3062-Hong-Kong-Port-and-Airport-Development-Strategy-(PADS)-1990 — Page 24

FCO40 Hong Kong Department Records 聯邦事務部香港部檔案 All

(f) 6th Consultancy Study (1988)

Alternative Replacement Airport Sites "ARAS"

Final Report Part I

Volume I: Main Report (mainly on site

selection)

Final Report Part I

Volume II: Appendices

(Appendix I

Meteorological

Studies

Appendix II

ATC/Airspace

Study and

Obstacle

Clearance

Constraints

Appendix IV

Appendix III Noise Studies

Runway Capacity

Study

Appendix V

Airport

Dimensions,

Manpower, Surface

Traffic,

Utilities

Appendix VI

Non-aviation Site

Selection

Criteria

Appendix VII Evaluation

- Final Report Part II

Matrices

(which includes the Main Report for Part II of ARAS study and the following appendices

Appendix I

Appendix II

Airport Layouts and Phasing

Further Noise Studies for the Selected Site

Appendix III ATC Arrangemetns for the

Appendix IV

Appendix V

Selected Site

Air Quality Study

Cost Estimates)

Executive Summary

(g) 7th Consultancy Study (1988-1989)

Port & Airport Development Strategy

Final Report

"PADS"

Comments

Approved members can add comments, bookmarks, and private notes.

No comments yet.

Private Research Note

Private notes are available after approval.