(f) 6th Consultancy Study (1988)
Alternative Replacement Airport Sites "ARAS"
Final Report Part I
Volume I: Main Report (mainly on site
selection)
Final Report Part I
Volume II: Appendices
(Appendix I
Meteorological
Studies
Appendix II
ATC/Airspace
Study and
Obstacle
Clearance
Constraints
Appendix IV
Appendix III Noise Studies
Runway Capacity
Study
Appendix V
Airport
Dimensions,
Manpower, Surface
Traffic,
Utilities
Appendix VI
Non-aviation Site
Selection
Criteria
Appendix VII Evaluation
- Final Report Part II
Matrices
(which includes the Main Report for Part II of ARAS study and the following appendices
Appendix I
Appendix II
Airport Layouts and Phasing
Further Noise Studies for the Selected Site
Appendix III ATC Arrangemetns for the
Appendix IV
Appendix V
Selected Site
Air Quality Study
Cost Estimates)
Executive Summary
(g) 7th Consultancy Study (1988-1989)
Port & Airport Development Strategy
Final Report
"PADS"