1
1.5
ANNEX II
1.4.3 Spacecraft and its support equipment transporta- tion from the Xichang Airport to the respective working places at XSLC (and return).
1.4.4 Assistance in Arrangement of customs for personal luggage and equipment required campaign as accompanied luggage.
clearance for the
CGWIC will ensure that the customs formalities will not result in undue delay if the personal equipment of Client's workteam comply with the Customs regulations.
luggage
and
Chinese
1.4.5 Transportation of luggage of the Client and contractors from the Xichang Airport to the hotel the working area (and return).
1.4.6 Transit of the launch vehicle at launch site.
1.4.7 Emergency Xichang
Chinese
airlift
will be arranged
its and
between Airport and the international airports within territory. Six hour abailability will be CGWIC will assist in
possible at normal conditions.
arranging international transportation. The flight cost is to the client.
Launch Site Services
1.5.1
Launch Vehicle operations
All the launch vehicle operations without the spacecraft.
Supply and fueling of propellants and various gases.
Spacecraft/launch
vehicle integration
and com-
bined operation cooperatively with the Spacecraft Work
Team
launch operations
1.5.2
Spacecraft Preparation Facilities and Personnel Support
Hazar-
Use of Spacecraft Preparation Building (BS2),
Solid Motor Building dous Operation Building (BS3), (BM), Equipment Storage Building, office room, launch service tower, Launch Control Center, and Mission Com- mand Control Center.
- Standard conditions of temperature and relative humi- dity for facilities shall be 22.5 deg. C + 2.5 deg.C and
3
Ав
No comments yet.
Private notes are available after approval.