1

1.5

ANNEX II

1.4.3 Spacecraft and its support equipment transporta- tion from the Xichang Airport to the respective working places at XSLC (and return).

1.4.4 Assistance in Arrangement of customs for personal luggage and equipment required campaign as accompanied luggage.

clearance for the

CGWIC will ensure that the customs formalities will not result in undue delay if the personal equipment of Client's workteam comply with the Customs regulations.

luggage

and

Chinese

1.4.5 Transportation of luggage of the Client and contractors from the Xichang Airport to the hotel the working area (and return).

1.4.6 Transit of the launch vehicle at launch site.

1.4.7 Emergency Xichang

Chinese

airlift

will be arranged

its and

between Airport and the international airports within territory. Six hour abailability will be CGWIC will assist in

possible at normal conditions.

arranging international transportation. The flight cost is to the client.

Launch Site Services

1.5.1

Launch Vehicle operations

All the launch vehicle operations without the spacecraft.

Supply and fueling of propellants and various gases.

Spacecraft/launch

vehicle integration

and com-

bined operation cooperatively with the Spacecraft Work

Team

launch operations

1.5.2

Spacecraft Preparation Facilities and Personnel Support

Hazar-

Use of Spacecraft Preparation Building (BS2),

Solid Motor Building dous Operation Building (BS3), (BM), Equipment Storage Building, office room, launch service tower, Launch Control Center, and Mission Com- mand Control Center.

- Standard conditions of temperature and relative humi- dity for facilities shall be 22.5 deg. C + 2.5 deg.C and

3

Ав

Share This Page